INSTALLATION METHOD 17
Please avoid installation in places of direct sunlight and extreme cold.
Install within temperatures of 5ºC and high in 25ºC
If the temperature is too high or low this may result in an
overworked machine.
INSTALLATION -
GROUNDING METHOD
If a grounded terminal outlet is missing, ground the machine using
copper wire to the water faucet.
Please coil up about 2~3 times with copper wire on faucet.
Please ground electical to prevent a short circuit or electric shock.
Insure all electical outlets are grounded properly.
• Do not ground on gas pipes,
plastic pipes or telephone lines.
• Ground wires are available from
the BK Korea service center
(S-cubism) and connect to the
back of the machine.
Summary of Contents for SUF-200NW-CK
Page 40: ...NOTES...