Operation and Installation Manual PBTC-200
21-54C3-7D0001/-
04/2021-EHT-441168
Notice:
Technical data subject to change without notice.
No claims for damage arising from alternations, errors or misprints shall be allowed.
Page 40 / 45
14 Recommissioning
WARNING
Risk of fire and electric shock from electrical trace heating system
Risk of injury due to electric current
When starting installation and maintenance work, disconnect all circuits from the power supply and check that they are
voltage-free!
Operate electrical trace heating systems with residual current protection device!
The steps required to put the unit back into operation depend on the state of disassembly, the steps taken when the unit is taken out
of operation and the state of the junction box with thermostat module. It must be ensured that it is in a safe and operational condition.
Before the junction box with thermostat module is put into operation again after it has been taken out of service, the entire operating
instructions must be observed, especially the safety rules. The instructions in Chapters Installation and Assembly, Commissioning
and Maintenance must be observed.
Recommissioning is only permitted if the insulation resistance measurement has been carried out again and the acceptance report
has been completed in full.
After removing a heating cable from the base of the junction box, a new suitable CAK kit must be used when installing a new heating
cable.
Summary of Contents for PBTC-200
Page 2: ......