1.
Without using a knife
, open the carton and remove the packaging which secures the
lift in the box. When removing the mast be careful as the lifting arm and actuator are
fastened to the mast.
2. Once all the parts have been removed from the carton, ensure you have all the
components which make up the lift. If there is a discrepancy please call your supplier
or Noram Solutions at
1-800-387-7103
3. Place the base on the floor and lock the rear castors to prevent movement while
assembling. Remove the three hex head bolts and plastic caps from the centre of the
base.
4. Position the mast over the corresponding holes in the base with the angle in the mast
tilting away from the lift and the actuator positioned between the legs of the lift.
5. Tighten all three bolts and replace the white caps over the bolt heads.
6. Remove the pivot bolt from the top of the mast and position the lifting arm between
the sides of the mast. Slip one nylon washer on both sides of the lifting arm, between
the lifting arm and the sides of the mast. Insert bolt and secure with nylock nut and
washer.
7. Remove the electronics pack from the small parts box.
8. Mount the electronics pack on the back of the Ready Care Lift mast using the two
machine screws (already attached to the mast).
9. Remove the battery pack from the small parts box and place it on the electronics
pack (see
Placing and Removing the Battery Pack
on page 17).
10. Take the plug end from the actuator and connect it to the actuator port on the
bottom of the electronics pack (see
Electronics Pack Bottom View
on page 14).
11. Test the emergency stop button by depressing it. Using the hand control (it is
attached to the electronics pack during shipping) push the up and down buttons. The
lifter should be inoperable. Disengage the emergency stop button by turning it in the
direction of the arrows (clockwise). Push the up and down buttons on the hand
control. The lifter should now operate up and down.
ASSEMBLY
7