Operating Instruction
1152263
25 / 32
EN
•
Prior t o firs t operation, cl ean the appli anc e and its equi pment ac cor ding t o i nstr ucti ons in
sect ion 6 'Cl eaning'
. Make sur e no water enters el ectric i nst allation and connec tion box. T hen thoroughl y dr y the appli anc e and t he entire eq uipm ent.
•
Ins ert t he bott om c over int o the applianc e. The c over acts as a spac er bet ween t he heating element and l ef t-over f ood tray.
•
Caref ull y i nser t t he c onnection box wit h the heati ng element at t he bac k edge of t he applianc e. A pin in bott om par t of t he c onnecti on box must ent er a hol e i n t he mai n applianc e. This way t he connec tion box is properly mo unt ed.
Appliance Start-up
The
1152273
and
1152293
appliances are equipped with 2 heating zones and,
respectively, in separate control elements, owing to which the heating zones may
be used and set-up separately. Each time, the below description pertains to one
heating zone.
Each gas controller features the following operating positions:
'0'
– ON position
– switching ignition burner on
1
–7
– temperature levels
Fig. 4
Switching Ignition Burner On
1. Press the gas controller and rotate it to
position.
2. Press the gas controller fully and switch off the ignition burner, using the
piezoelectric igniter's button.
3. Keep the gas controller knob pressed for approx. 20 seconds, and then release
it. If the ignition flame is out, repeat the process.
The ignition flame may be observed via the sight glass, when the grease collection
container is removed.
Switching Main Burner On
1. Rotate the main burner from
position to
7
position.
2. Rotate the gas controller depending on the required temperature of heat
processing to one of the temperature levels of
1
–7
.