background image

 
 

 

12 

ENGLISH 

GB 

 

When the device is to be 

installed near the walls, partitions, 
kitchen cabinets, decorative elements, 
etc., they must be made from non-
flammable materials or covered with 
suitable non-flammable materials.

 

Internal installation of the gas supply and the rooms 
in which the device is housed must comply with the 
local regulations applicable in the country in which 
the device is used (Regulation of 12th of July 1996 
and UNI-CIG 87/23). 

In  order  to  ensure  proper  gas  burning  in  the 
burners  the  required  volume  of  air,  i.e.  approx.  2 
cubic  meters  per  hour  for  every  kW  of  installed 
power, must be supplied. 
 
 
 
 

8.3. 

Extraction of fumes 

 
The fumes from the stove should be continuously 
extracted  with  use  of  kitchen  extraction  hoods 
connected  to  the  extraction  dusts  or  stacks,  or 
extracting  directly  outside.  When  no  kitchen 
extraction  hood  may  be  installed,  use  the  fan  for 
direct  extraction  outside,  connected  in  such  way 
that lock of suction fan interrupts the gas supply. 

 
Installation  of  stoves  of  type  “

A

”  does  not 

envisage connection to the  fume exhaust system, 
but  to  the  appropriate  extraction  hood  which 
removes the fumes outside. 

 
 
 

8.4. 

Installation of the appliance in a line

 

 

 

 
To fix the appliance in a line (neighbouring) follow 
the steps: 

Dismantle the control panel, and remove the cast 
iron frame from the chimney if necessary. 
Apply the sealing tape (

A

) onto the joining sides. 

Place  the  appliances  next  to  each  other  and  in  a 
horizontal position (by adjusting the feet). 
Connect the appliances with the joining elements. 
 
 
 
 
 
 

8.5. 

Gas connection (service technician)  

 
The  gas  connection  must  be  performed  in 
compliance with the applicable regulations. 

Before  connecting  the  device  check  the  technical 
data,  type of gas,  working pressure and flow rate 
which are provided on the rating plate. 

The  installation  is  performed  by  connecting  the 
connection  pipe  of  the  device  with  a  pipe  of  the 
gas distribution network. The cut-off valve must be 
installed on the connection to shut the gas supply 
off if necessary. 

Summary of Contents for FAE92M00

Page 1: ...2952271 FAE92M00 2952481 FAE93M00 Rev Nr 01 2017 INSTALLATIONS BEDIENUNGS UND W ARTUNGSANW EISUNGEN INSTALLATION OPERATING AND MAINTENANCE NSTRUCTIONS MANUEL D INSTALLATION D UTILISATION ET D ENTRETIE...

Page 2: ...ODIFICATIONS TECHNIQUES CI RISERVIAMO LA POSSIBILIT DI INTRODURRE MODIFICHE TECNICHE SE RESERVA EL DERECHO A INTRODUCIR MODIFICACIONES T CNICAS SUJEITO A ALTERA ES T CNICAS TECHNISCHE WIJZIGINGEN VOOR...

Page 3: ...6 4 Cleaning of the oven 9 7 TROUBLESHOOTING 10 8 INSTALLATION 11 8 1 Packaging and unpacking 11 8 2 Installation service technician 11 8 3 Extraction of fumes 12 8 4 Installation of the appliance in...

Page 4: ...ning and maintenance 8 Guidelines on how to use the device 8 I Ignition of gas burners 7 Installation 11 Installation of the appliance in a line 12 M Minimum setting of the heating plate burner valve...

Page 5: ...other use is considered as the use not in compliance with the intended use The manufacturer is not liable for material damage or damage to person caused by misapplication or incorrect application of t...

Page 6: ...or draw attention to essential data Caution warning Indicate important safety instructions You should acquire the proper conduct to prevent hazard against people health and safety or not to cause any...

Page 7: ...ction devices are mounted correctly and operational 4 4 Rating plate The rating plate shown in the drawing is fixed directly on the device It includes all guidelines and information required for safe...

Page 8: ...e altered the safety requirements 5 USE AND OPERATION 5 1 Description of the controls The elements controlling the essential functions are located on the control panel of the device A Burner control k...

Page 9: ...g on and off A Start the automatic switch off to turn on the electrical connection B Turn the oven switch A to activate the oven heating elements The green control light L will come on C Turn the oven...

Page 10: ...ING AND MAINTENANCE 6 1 Guidelines on cleaning and maintenance Before the maintenance works turn on all installed protective devices In particular disconnect the electric power supply by means of the...

Page 11: ...elements Protect the gas burner interior from penetration of water and dirt in order to avoid incorrect operation and clogging of nozzles 6 4 Cleaning of the oven When the oven is cold remove bottom a...

Page 12: ...ently hot Extend the ignition process Yellow flame The burner is contaminated or moist Clean the burner and leave for drying When problem persists contact the service company It is difficult to rotate...

Page 13: ...o cut the carton box It may damage the stainless steel inside the box Remove the carton packaging from bottom to top When unpacked check if the appliance is according to the order In case of any diffe...

Page 14: ...cted in such way that lock of suction fan interrupts the gas supply Installation of stoves of type A does not envisage connection to the fume exhaust system but to the appropriate extraction hood whic...

Page 15: ...make sure that the device has been initially connected with the appropriate all pole switch with a contact opening of min 3 mm To correctly connect the device follow the guidelines below Connect the...

Page 16: ...nections 3 Check that the protection devices work correctly 9 SETTINGS service technician Before setting the device switch on all protection devices First of all close the gas valve and prevent access...

Page 17: ...turi pipe F When required replace the nozzle G with a nozzle intended for used gas see appendices Tighten the screw E and restore the initial settings 9 3 Replacement of gas burner ignition flame nozz...

Page 18: ...roduct or attached manual indicates that the product cannot be considered as ordinary household waste and should be transferred to a special collection point for electrical and electronic appliances f...

Page 19: ...I ANLAGEN ATTACHMENTS ANNEXES ALLEGATI ANEXOS ANEXOS BIJLAGEN ZA CZNIKI...

Page 20: ...3 1 90 FAE93M00 1 2 3 37 5 3 97 4 62 2 96 2 91 Modelle Backofen Leistung Daten zu Elektrik Model Oven Power Electrical connection Mod lle Four Puissance Raccordement lectrique Modello Forno Potenza Da...

Page 21: ...50 950 800 79 245 79 85 715 650 19 23 105 5kW 130 8kW 75 3 5kW ANSCHLUSSSCHEMA CONNECTION CARD FICHE DES RACCORDEMENTS SCHEDA ALLACCIAMENTI FICHA DE ENLACES ESQUEMA DAS CONEX ES PLAN AANSLUITINGEN SCH...

Page 22: ...290 370 245 950 19 1 2 23 105 5kW 130 8kW 75 3 5kW 105 5kW 130 8kW 75 3 5kW FAE93M00 ANSCHLUSSSCHEMA CONNECTION CARD FICHE DES RACCORDEMENTS SCHEDA ALLACCIAMENTI FICHA DE ENLACES ESQUEMA DAS CONEX ES...

Page 23: ...3 5 1 140 Reg Reg 8 CZ II2H3 G30 G31 28 37 3 5 1 90 40 21 Aperto Open G20 20 3 5 1 140 Reg Reg 8 DE II2ELL3B P G30 G31 50 3 5 1 80 40 21 8 G20 20 3 5 1 140 Reg Reg 8 G25 20 3 5 1 160 Reg Reg 8 DK II2H...

Page 24: ...40 21 Aperto Open G20 20 3 5 1 140 Reg Reg 8 SI II2H3 G30 G31 28 37 3 5 1 90 40 21 Aperto Open G20 20 3 5 1 140 Reg Reg 8 II2H3B P G30 G31 30 3 5 1 90 40 21 Aperto Open G20 20 3 5 1 140 Reg Reg 8 SK I...

Page 25: ...30 G31 28 37 5 1 3 115 Reg 21 Aperto Open G20 20 5 1 3 165 Reg Reg Aperto Open DE II2ELL3B P G30 G31 50 5 1 3 100 Reg 21 Aperto Open G20 20 5 1 3 165 Reg Reg Aperto Open G25 20 5 1 3 180 Reg Reg Apert...

Page 26: ...3B P G30 G31 30 5 1 3 115 Reg 21 Aperto Open G20 20 5 1 3 165 Reg Reg Aperto Open SI II2H3 G30 G31 28 37 5 1 3 115 Reg 21 Aperto Open G20 20 5 1 3 165 Reg Reg Aperto Open II2H3B P G30 G31 30 5 1 3 115...

Page 27: ...8 2 8 205 Reg Reg 8 CZ II2H3 G30 G31 28 37 8 2 8 140 Reg 21 Aperto Open G20 20 8 2 8 205 Reg Reg 8 DE II2ELL3B P G30 G31 50 8 2 8 125 Reg 21 Aperto Open G20 20 8 2 8 205 Reg Reg 8 G25 20 8 2 8 230 Reg...

Page 28: ...140 Reg 21 Aperto Open G20 20 8 2 8 205 Reg Reg 8 SI II2H3 G30 G31 28 37 8 2 8 140 Reg 21 Aperto Open G20 20 8 2 8 205 Reg Reg 8 II2H3B P G30 G31 30 8 2 8 140 Reg 21 Aperto Open G20 20 8 2 8 205 Reg R...

Page 29: ...e Table of gas pressure Tableau des pressions Tabella pressioni di gas Tabla de presi n del gas Tabela de press o de g s Tabel van gasdruk Tabela ci nienia gazu IT GB IE PT CH GR ES CZ 17 20 25 20 30...

Page 30: ...3 230V T120 Silicon Leads M MORSETTIERA FV122 6 POLI 40 A 450 V RF1 RESISTENZE SUPER FORNO 3300 watt 1x RF2 RESISTENZE INFER FORNO 2300 watt 1x 2 1 3 1 230V 14 5 A 230V 10 5 A 1800 watt 2x 1800 watt...

Page 31: ...XIII NOTE...

Page 32: ...ESTO MANUALE CON DIVIETO DI RIPRODURLO E O DISTRIBUIRLO IN QUALSIASI FORMA SENZA NOSTRA AUTORIZZAZIONE DE ACUERDO CON LOS T RMINOS DE LA LEY EST RESERVADA LA PROPIEDAD DE ESTE MANUAL CON EXPRESA PROHI...

Reviews: