5-4
BE1-24 Testing
Definite Time Delay Alarm
Step 1.
Connect the unit as shown in Figure 5-1.
Step 2.
Adjust the front panel thumbwheel switches as follows:
• INST. PICKUP
- 2.00 V/Hz
• TIME TRIP PICKUP
- 2.00 V/Hz
• TIME DIAL
- 0.1
• RESET
- 0.1
• ALARM PICKUP
- 2.00 V/Hz
• ALARM TIME DELAY - 0.0
Step 3.
Adjust the ALARM TIME DELAY to 0.1.
Step 4.
Apply 130 Vac at 60 Hz to the relay and record the interval from initiation to alarm output
contact transition. (Time should be 0.1 ±0.08 seconds.)
Step 5.
Repeat step 4 for ALARM TIME DELAY settings of 3.0 and 9.9. Recorded times should be
as follows.
Setting
Expected Time
3.0
3.0 ±0.075 seconds
9.9
9.9 ±0.099 seconds
Inverse Square Timing
Step 1.
Connect the unit as shown in Figure 5-1.
Step 2.
Adjust the front panel thumbwheel switches as follows:
• INST. PICKUP
- 2.00 V/Hz
• TIME TRIP PICKUP
- 2.00 V/Hz
• TIME DIAL
- 0.1
• RESET
- 0.1
• ALARM PICKUP
- 2.00 V/Hz
• ALARM TIME DELAY - 0.0
Step 3.
Prepare to apply 144 Vac at 60 Hz (M = 1.2) to the relay and measure the elapsed time from
initiation of the input condition to timed trip output contact transition.
Verify that the timed interval from initiation of input condition to transition of the timed trip
output contacts agrees with the characteristic curve graph in Section 1 (estimated 2.1 ±0.2
seconds).
Summary of Contents for BE1-24
Page 9: ...1 4 BE1 24 General Information Figure 1 1 Inverse Square vs Two Step...
Page 10: ...BE1 24 General Information 1 5 Figure 1 2 Protection Characteristics of the BE1 24...
Page 12: ...BE1 24 General Information 1 7 Figure 1 3 Style Number Identification Chart...
Page 16: ...BE1 24 General Information 1 11 Figure 1 4 Inverse Square Characteristic Curves...
Page 19: ...2 2 BE1 24 Human Machine Interface Figure 2 1 Location of Controls and Indicators...
Page 27: ...4 2 BE1 24 Installation Figure 4 1 M1 Case Outline Dimensions Front View...
Page 30: ...BE1 24 Installation 4 5 Figure 4 4 M1 Case Double Ended Panel Drilling Diagram Rear View...
Page 31: ...4 6 BE1 24 Installation Figure 4 5 M1 Case Panel Drilling Diagram...
Page 32: ...BE1 24 Installation 4 7 Figure 4 6 M1 Case Projection Mounting Outline Dimensions Rear View...
Page 34: ...BE1 24 Installation 4 9 Figure 4 7 Typical Internal Connections...