BE1-50/51M-222 Testing
5-3
NOTES
When testing TIME overcurrent functions, INST PICKUP settings of 00 will affect the
calibration of the TIME functions. TIME PICKUP settings of 00 also affect INST
functions.
Test Procedure
Time Pickup Test
Perform preliminary setup:
Connect test setup as shown in Figure 5-1.
Insure that SW8 switches are set correctly: SW8-1 for operating frequency, SW8-2 to OFF (no
instantaneous delay), SW8-3 to OFF (no instantaneous delay), and SW8-4 to OFF (selects
instantaneous reset).
Set TIME DIAL to 0.0.
Set CURVE to S
Set TIME PICKUP to 0.5.
Set INST PICKUP to 90.
Step 1. Slowly increase current to terminals 8 and 9. PICKUP LED should turn ON at a maximum input
current of 0.550 ampere.
Step 2. Decrease input current until PICKUP LED turns OFF.
Step 3. Set TIME PICKUP to 2.2.
Step 4. Slowly increase current to terminals 8 and 9. PICKUP LED should turn ON at an input current of
2.131 to 2.269 amperes.
Step 5. Decrease input current until PICKUP LED turns OFF.
INST Pickup Test
Perform preliminary setup:
Connect test setup as shown in Figure 5-1.
Insure that SW8 switches are set correctly: SW8-1 for operating frequency, SW8-2 to OFF (no
instantaneous delay), SW8-3 to OFF (no instantaneous delay), and SW8-4 to OFF (selects
instantaneous reset).
Set TIME DIAL to 0.0.
Set CURVE to S
Set TIME PICKUP to 15.1.
Set INST PICKUP to 01.
Step 1. Slowly increase current to terminals 8 and 9. INST contacts should close at an input current of
0.955 to 1.045 amperes.
Step 2. Decrease input current until INST output contacts open.
Step 3. Set INST PICKUP to 08.
Summary of Contents for BE1-50/51M-222
Page 29: ...BE1 50 51M 222 Installation 4 2 Figure 4 1 Outline Dimensions C1 Case ...
Page 30: ...BE1 50 51M 222 Installation 4 3 Figure 4 2 Panel Drilling Diagram C1 Case ...
Page 32: ...BE1 50 51M 222 Installation 4 5 Figure 4 4 DC Control Connections ...
Page 33: ...BE1 50 51M 222 Installation 4 6 Figure 4 5 BE1 50 51M 222 Overcurrent Relay Rear View ...