9310200990 Rev G
BE1-79A Testing
6-1
SECTION 6
•
TESTING
INTRODUCTION
You may prefer to test your relay before installation. To test BE1-79A relay functionality, perform the
procedures in the following paragraphs. Figure 6-1 illustrates the necessary connections for testing relays
configured for ACR11A style operation. The connections diagram for testing relays configured for
ACR11B operation is provided in Figure 6-2.
INSTANTANEOUS RECLOSE TESTING
ACR11A Style
Place Relay Style Configuration switches S1, S2, and S3 in the A position. Place Instantaneous Reclose
Jumper switch S4 in the EXT position. Place RS Contact switch S5 in the NO position.
ACR11B Style
Place Relay Style Configuration switches S1, S2, and S3 in the B position. Place Instantaneous Reclose
Jumper switch S4 in the INT position. Place RS Contact switch S5 in the NO position.
ACR11A and ACR11B Styles
1. Place Test switch S1 in the 52a position and apply 120 Vac to the relay and test circuit.
2. Connect a PC with a serial port and suitable communication software to the relay serial port. Transmit
the settings of Table 6-1 to the relay.
Table 6-1. Instantaneous Reclose Testing Commands
Command
Time Between Recloses
ACCESS=<cr> N/A
SP-79A1=0.0,5.0<cr>
0 – 0 = 0s
SP-79A2=10.0,15.0<cr>
10 – 0 = 10s
SP-79A3=20.0,25.0<cr>
20 – 10 = 10s
SP-79A4=30.0,35.0 <cr>
30 – 20 = 10s
SP-79ALO=40.0,45.0<cr>
40 – 30 = 10s
SP-79ARS=D,19.39,0<cr> N/A
EXIT<cr> N/A
Y<cr> N/A
3. Place Test switch S1 in the 52b position and observe that the following sequence of events occur.
a. Front panel Reset LED turns off
b. Reset indicator L1 turns off
c. Front panel In Sequence LED lights
d. Reclose indicator L2 will light immediately and remain lit for three seconds
e. After 10 seconds, L2 will light for three seconds
f. After 20 seconds, L2 will light for three seconds
g. After 30 seconds, L2 will light for three seconds
h. After 40 seconds, the front panel Lockout led and Lockout indicator L3 will light
NOTE
The following test procedures specify 120 Vac for relay power and the contact
sensing inputs. Therefore, contact sensing jumpers P3, P4, P5, and P6 must be
set in position 1 or position 2. The contact sensing circuitry will not function with
120 Vac applied and the contact-sensing jumpers setting position 3.
Summary of Contents for BE1-79A
Page 1: ...INSTRUCTION MANUAL FOR RECLOSING RELAY BE1 79A Publication 9310200990 Revision G 02 08...
Page 2: ......
Page 8: ...vi BE1 79A Introduction 9310200990 Rev G This page intentionally left blank...
Page 10: ...ii BE1 79A General Information 9310200990 Rev G This page intentionally left blank...
Page 16: ...ii BE1 79A Controls and Indicators 9310200990 Rev G This page intentionally left blank...
Page 20: ...2 4 BE1 79A Controls and Indicators 9310200990 Rev G This page intentionally left blank...
Page 22: ...ii BE1 79A Functional Description 9310200990 Rev G This page intentionally left blank...
Page 34: ...ii BE1 79A Communication Commands 9310200990 Rev G This page intentionally left blank...
Page 40: ...ii BE1 79A Installation and Configuration 9310200990 Rev G This page intentionally left blank...
Page 52: ...ii BE1 79A Testing 9310200990 Rev G This page intentionally left blank...
Page 58: ...6 6 BE1 79A Testing 9310200990 Rev G This page intentionally left blank...
Page 60: ...ii BE1 79A RS Contact Application 9310200990 Rev G This page intentionally left blank...
Page 66: ...ii BE1 79A Terminal Communication 9310200990 Rev G This page intentionally left blank...