9365200990 Rev F
BE1-CDS240 Quick Start
2-7
While editing this file, it is necessary to set a logic scheme to be active using the SL-N= (Set Protection
LOGIC) command. The default setting is BASIC-87, which means that several protection elements are
enabled and interconnected but are disabled with settings of zero. See Section 8,
Application
, for
diagrams that describe the BASIC-87 logic scheme.
Enter A= to gain setting access and then send each of these text files to the relay as described above
under
Batch Command Text File Operations
. Do not forget to add E;Y (Exit; Save Settings? Yes) to the
end of both files.
As you gain knowledge of the relay, you can experiment with the rest of the settings. To set up a file with
all user settings, enter S and the relay will respond with all settings in command format. The acceptance
test procedure in Section 13,
Testing and Maintenance
, provides a basic procedure for creating a file with
all user settings.
Checking the State of Inputs
Section 8,
Application
, shows the Basic Differential (CDS240-BA87-A-BD) logic diagram. Review this
logic to help understand the following discussion. In this scheme, IN1 and IN2 are being used to show the
position of the breakers in the sequence of events record (SER). Input 3 is showing the status of the 86
lockout relay. Inputs 6 to 8 can be used for alarm annunciation. You can quickly review the state of the
inputs in three different ways: one, through the front panel HMI, two, using the ASCII command interface,
or three using BESTCOMS,
Metering
screen.
The front panel HMI displays the input status on Screen 1.4.1,
\STAT\OPER\INPUT
. A diagram showing
all of the menu tree branches is located in Section 10,
Human-Machine Interface
. To get to this screen,
press the
Up
scrolling pushbutton until you reach the top screen in the current branch. You know when
you have reached the top screen because the screen stops changing when you press the
Up
scrolling
pushbutton. From this position, press the
Right
scrolling pushbutton until you have reached the screen
titled,
\STATUS BE1-CDS240 REPORT STATUS
. From this position, press the
Down
scrolling
pushbutton one time (
\STAT\TARGETS
) and press the
Right
scrolling pushbutton three times. At this
time, you should see the OPERATIONAL STATUS Screen,
\STAT\OPER_STAT
. If you press the
Down
scrolling pushbutton from this screen, you should see the INPUTS Screen,
\STAT\OPER\INPUT
.
Another method would be to use the ASCII command interface. One command that you can use to see
the status of the inputs is RG-STAT. Another command is RG-INPUT. This command will only read the
status of the inputs and nothing else.
Testing
To determine if the relay is responding correctly to each test, the following commands are useful.
RG-TARG, (report general targets): reports the targets from the last fault.
RF, (report faults): reports a directory listing of the twelve fault summary reports. The fault
summary reports are numbered from 1 to 255, then wrap around, and start over. RF-### reports
the ### report.
RS-##, (report sequence of events record), ## events: reports the most recent ## changes of
state in the protection and control logic.
FAQ/TROUBLESHOOTING
Frequently Asked Questions (FAQs)
1.) Will
the
Trip LED reset after pressing the Reset key on the front panel?
The
Reset
key is context sensitive. To reset the
Trip
LED or the targets, the
Targets
screen
must be displayed. To reset the alarms, the
Alarms
screen must be displayed.
2.)
Is the power supply polarity sensitive?
No, the power supply will accept either an ac or dc voltage input. However, the contact sensing
for the programmable inputs is polarity sensitive. See Section 12,
Installation
, for a typical inter-
connection diagram.
Summary of Contents for BE1-CDS240
Page 2: ......
Page 8: ...vi BE1 CDS240 Introduction 9365200990 Rev F This page intentionally left blank ...
Page 38: ...1 28 BE1 CDS240 General Information 9365200990 Rev F This page intentionally left blank ...
Page 40: ...ii BE1 CDS240 Quick Start 9365200990 Rev F This page intentionally left blank ...
Page 152: ...ii BE1 CDS240 Metering 9365200990 Rev F This page intentionally left blank ...
Page 226: ...iv BE1 CDS240 Application 9365200990 Rev F This page intentionally left blank ...
Page 286: ...ii BE1 CDS240 Security 9365200990 Rev F This page intentionally left blank ...
Page 290: ...9 4 BE1 CDS240 Security 9365200990 Rev F This page intentionally left blank ...
Page 292: ...ii BE1 CDS240 Human Machine Interface 9365200990 Rev F This page intentionally left blank ...
Page 306: ...10 14 BE1 CDS240 Human Machine Interface 9365200990 Rev F This page intentionally left blank ...
Page 308: ...ii BE1 CDS240 ASCII Command Interface 9365200990 Rev F This page intentionally left blank ...
Page 342: ...11 34 BE1 CDS240 ASCII Command Interface 9365200990 Rev F This page intentionally left blank ...
Page 349: ...Figure 12 5 Horizontal Rack Mount Front View 9365200990 Rev F BE1 CDS240 Installation 12 5 ...
Page 361: ...Figure 12 17 Typical DC Connection Diagrams 9365200990 Rev F BE1 CDS240 Installation 12 17 ...
Page 372: ...12 28 BE1 CDS240 Installation 9365200990 Rev F This page intentionally left blank ...
Page 468: ...13 92 BE1 CDS240 Testing and Maintenance 9365200990 Rev F This page intentionally left blank ...
Page 512: ...14 42 BE1 CDS240 BESTCOMS Software 9365200990 Rev F This page intentionally left blank ...
Page 544: ...ii BE1 CDS240 Terminal Communication 9365200990 Rev F This page intentionally left blank ...
Page 550: ...ii BE1 CDS240 Settings Calculations 9365200990 Rev F This page intentionally left blank ...
Page 578: ...D 28 BE1 CDS240 Settings Calculations 9365200990 Rev F This page intentionally left blank ...
Page 579: ......