BE1-DFPR Testing
5-19
Settings menu. This disables all other functions from tripping the relay so just the 50T function
can be checked.
Step 16. Connect a current source to any phase current input or the neutral current input.
Step 17. Close the breaker on the test set and wait for the RST LED to illuminate on the relay.
Step 18. Apply an appropriate amount of current to trip the relay and measure the time from when the
current is applied until the Trip 1 contacts close. This timing should be within ±5% or 25 ms of the
time delay setting that is set in the Relay Settings screen (50TP TD for a phase timing and 50TN
TD for a neutral timing).
Step 19. Return to the Tripping Logic screen and return the Trip 1 settings to the desired values. Press
ESC to save the settings, then press ESC again to return to the Review/Edit Settings menu.
27 Timings
Step 20. From the Review/Edit Settings Menu on the terminal, select 2, 5, 8, I, or L to enter the Tripping
Logic screen for the desired settings group.
Step 21. Enter N in all Trip 1 locations except 27/59. Enter Y in the 27/59 location. Press ESC to save
these settings, then press ESC again to return to the Review/Edit Settings menu. This disables
all other functions from tripping the relay so just the 27/59 function can be checked.
Step 22. Connect a voltage source to the phase you wish to check. The other two phases will need to be
connected to a voltage source with a voltage applied that is greater than the 27 setting in the
Normal Mode Settings.
Step 23. Close the breaker on the test set and wait for the RST LED to illuminate on the relay.
Step 24. Step the voltage down on one phase to a point lower than the 27 PU voltage and measure the
time from when the voltage is stepped down until the Trip 1 contacts close. This timing should be
within ±5% or 30 milliseconds, whichever is greater, of the 27 TD setting that is set in the Relay
Settings screen.
Step 25. Return to the Tripping Logic screen and return the Trip 1 settings to the desired values. Press
ESC to save the settings, then press ESC again to return to the Review/Edit Settings menu.
81 Timings
Step 26. From the Review/Edit Settings Menu, select 2, 5, 8, I, or L to enter the Tripping Logic screen for
the desired settings group.
Step 27. Enter a N in all Trip 1 locations except 81. Enter a Y in the 81 location. Press ESC to save these
settings, then press ESC again to return to the Review/Edit Settings menu. This disables all other
functions from tripping the relay so just the 81 function can be checked.
Step 28. Connect the voltage inputs in parallel and connect a frequency source to the voltage inputs. Set
the voltage level to a level greater than the 81 INH setting in the Normal Mode Settings.
Step 29. Close the breaker on the test set and wait for the RST LED to illuminate on the relay.
Step 30. Step the frequency down to a point below the 81 T HZ setting and measure the time from when
the frequency is stepped down until the Trip 1 contacts close. This timing should be within ±10%
or 50 ms of the 81 T TD setting that is set in the Relay Settings screen.
Summary of Contents for BE1-DFPR
Page 10: ...BE1 DFPR General Information 1 4 Figure 1 1 Terminal Screens Flow Diagram Sheet 1 Of 2 ...
Page 11: ...BE1 DFPR General Information 1 5 ...
Page 12: ...BE1 DFPR General Information 1 6 Figure 1 2 Terminal Screens Flow Diagram Sheet 2 Of 2 ...
Page 15: ...BE1 DFPR General Information 1 9 ...
Page 23: ...BE1 DFPR General Information 1 17 ...
Page 24: ...BE1 DFPR General Information 1 18 Figure 1 4 Style Number Identification Chart ...
Page 26: ...BE1 DFPR General Information 1 20 KIWTG 6KOKPI 1RVKQP 5 5JQTV PXGTUG ...
Page 27: ...BE1 DFPR General Information 1 21 ...
Page 28: ...BE1 DFPR General Information 1 22 KIWTG 6KOKPI 1RVKQP QPI PXGTUG ...
Page 29: ...BE1 DFPR General Information 1 23 ...
Page 30: ...BE1 DFPR General Information 1 24 KIWTG 6KOKPI 1RVKQP GHKPKVG 6KOG ...
Page 31: ...BE1 DFPR General Information 1 25 ...
Page 32: ...BE1 DFPR General Information 1 26 KIWTG 6KOKPI 1RVKQP QFGTCVG PXGTUG ...
Page 33: ...BE1 DFPR General Information 1 27 ...
Page 34: ...BE1 DFPR General Information 1 28 KIWTG 6KOKPI 1RVKQP PXGTUG ...
Page 35: ...BE1 DFPR General Information 1 29 ...
Page 36: ...BE1 DFPR General Information 1 30 KIWTG 6KOKPI 1RVKQP 8 8GT PXGTUG ...
Page 37: ...BE1 DFPR General Information 1 31 ...
Page 38: ...BE1 DFPR General Information 1 32 KIWTG 6KOKPI 1RVKQP ZVTGOGN PXGTUG ...
Page 39: ...BE1 DFPR General Information 1 33 ...
Page 40: ...BE1 DFPR General Information 1 34 KIWTG 6KOKPI 1RVKQP 5 5VCPFCTF PXGTUG ...
Page 41: ...BE1 DFPR General Information 1 35 ...
Page 42: ...BE1 DFPR General Information 1 36 KIWTG 6KOKPI 1RVKQP 5 8GT PXGTUG ...
Page 43: ...BE1 DFPR General Information 1 37 ...
Page 44: ...BE1 DFPR General Information 1 38 KIWTG 6KOKPI 1RVKQP 5 ZVTGOGN PXGTUG ...
Page 45: ...BE1 DFPR General Information 1 39 ...
Page 46: ...BE1 DFPR General Information 1 40 KIWTG 6KOKPI 1RVKQP 5 QPI 6KOG PXGTUG ...
Page 47: ...BE1 DFPR General Information 1 41 ...
Page 48: ...BE1 DFPR General Information 1 42 KIWTG 6KOKPI 1RVKQP KZGF 6KOG ...
Page 50: ...BE1 DFPR Controls and Indicators 2 2 Figure 2 1 BE1 DFPR Horizontal Mount ...
Page 51: ...BE1 DFPR Controls and Indicators 2 3 ...
Page 52: ...BE1 DFPR Controls and Indicators 2 4 Figure 2 2 BE1 DFPR Vertical Mount ...
Page 57: ...BE1 DFPR Controls and Indicators 2 9 Figure 2 3 Control Module Front Panel Horizontal Mount ...
Page 59: ...BE1 DFPR Functional Description 3 2 ...
Page 60: ...BE1 DFPR Functional Description 3 3 ...
Page 61: ...BE1 DFPR Functional Description 3 4 KIWTG WPEVKQPCN NQEM KCITCO ...
Page 70: ...BE1 DFPR Functional Description 3 13 and 50TN ...
Page 85: ...BE1 DFPR Installation 4 2 ...
Page 86: ...BE1 DFPR Installation 4 3 Figure 4 1 Outline Dimensions Rack Mounting ...
Page 87: ...BE1 DFPR Installation 4 4 ...
Page 88: ...BE1 DFPR Installation 4 5 Figure 4 2 Outline Dimensions Panel Mounting ...
Page 90: ...BE1 DFPR Installation 4 7 Figure 4 3 DC Control Connections Typical ...
Page 91: ...BE1 DFPR Installation 4 8 ...
Page 92: ...BE1 DFPR Installation 4 9 Figure 4 4 Connection Diagram ...
Page 93: ...BE1 DFPR Installation 4 10 ...
Page 94: ...BE1 DFPR Installation 4 11 Figure 4 5 BE1 DFPR Rear View ...
Page 95: ...BE1 DFPR Installation 4 12 ...
Page 96: ...BE1 DFPR Installation 4 13 Figure 4 6 Communications Interface ...
Page 97: ...BE1 DFPR Installation 4 14 ...
Page 98: ...BE1 DFPR Installation 4 15 Figure 4 7 RS 232 Connection Diagram For IBM Type Computers ...
Page 100: ...BE1 DFPR Installation 4 17 Figure 4 9 RS 232 Interconnection Diagram For RFL 9660 Switch ...
Page 103: ...BE1 DFPR Testing 5 3 ...
Page 104: ...BE1 DFPR Testing 5 4 Figure 5 1 BE1 DFPR Test Simulator Front View ...
Page 105: ...BE1 DFPR Testing 5 5 ...
Page 106: ...BE1 DFPR Testing 5 6 Figure 5 2 BE1 DFPR Test Simulator Rear View ...
Page 107: ...BE1 DFPR Testing 5 7 ...
Page 108: ...BE1 DFPR Testing 5 8 Figure 5 3 BE1 DFPR Test Simulator Schematic Diagram Sheet 1 of 2 ...
Page 109: ...BE1 DFPR Testing 5 9 ...
Page 110: ...BE1 DFPR Testing 5 10 Figure 5 4 BE1 DFPR Test Simulator Schematic Diagram Sheet 2 of 2 ...
Page 111: ...BE1 DFPR Testing 5 11 ...
Page 112: ...BE1 DFPR Testing 5 12 Figure 5 5 Test Setup Diagram ...
Page 114: ...BE1 DFPR Testing 5 14 ...
Page 134: ...BE1 81 O U Maintenance 6 2 ...