8. Reinstall the finger guards if applicable.
9. Install the new grooved zone rollers and bands on the tracking zone, centered on the heavy duty
roller. It is not necessary to band the entire zone together, as long as at least one banded roller
engages with the belt on either side of the heavy duty roller. (6 rollers for 3” RC or 8 rollers for 2”
RC). The bands may be installed on either side of the conveyor if needed.
10. The non-grooved rollers and pressure roller that were removed during the install process may be
added to the system spares.
Figure 20: Pressure Roller Locations for 2”RC Pressure Modules