Magicvapor
11
2016
2.
IMPORTANT
Before installing MAGICVAPOR, it is necessary to set up a protected electrical socket suitable
to its power (an earth protector magneto-thermic switch 16 A ld 30mA is recommended).
This ironing board is not suitable for children, people with physical or mental handicaps or
inexperienced persons, unless they are instructed by a person who takes the responsibility
for their safety. Children must not play with the ironing board.
3.
OPENING OF PACKAGE
1.
Open the box containing MAGICVAPOR (ALTO ), take out the instruction manual
and read it carefully.
2.
Remove MAGICVAPOR from the box, position the iron rest support and insert the
cable support deep into the special hole (fig. 1).
3.
Fix the spring to the support hook, paying attention in order to avoid entwining
(fig. 1).
4.
Place the iron on the rubber iron rest supplied with the machine (fig. 1).
5.
Place the board horizontally and press on the board (fig. 1 – point
P
) until the
board is fixed to the hook.
ATTENTION:
make sure the board is fixed before starting to iron.
4.
CONNECTION AND STARTING
With MAGICVAPOR switched off and disconnected, plug:
1.
Unscrew the safety valve plug (fig. 1) and fill the boiler with water to the desired
level by using a funnel, paying attention not to exceed MAX level marked on the
sight glass (fig. 2). Take the plug by the plastic part and screw it again: do not
tighten too much or its gasket might get ruined (see section 7).
N.B. make sure the exhaust tap of the boiler is closed (fig. 1).
2.
Insert the plug into a 230 V 16 A socket.
In case the boiler is filled too much,
the iron might leak water. In this case
unscrew the safety valve plug a bit, let all the steam come out of the boiler and
turn the exhaust tap so that the excess water flows out (see section 8).
3.
Switch on the boiler (fig. 2 B) and the iron (fig. 2 C) and set the iron thermostat on
“cotton” (fig. 4).
4.
Wait for the boiler lamp to switch off (fig. 2 A) Seize the iron by the cork handle
and press the iron micro-switch 4 or 5 times (fig. 5), so that steam comes out. It is
important to make sure it is a saturated steam (by pressing the micro switch with
the iron pointed downwards). You can adjust the steam flux by turning the knob
placed on the solenoid valve (fig. 3). Now everything is ready for ironing. During
ironing operation, the boiler lamp switches on and off (fig. 2 A).