IMPORTANT - Advice and safety - Please read before installation
Tools & equipment needed:
Drill, 8mm Suitable drill bit, Phillips screwdriver, Spirit level, Ruler/tape measure, Pencil,
Silicone sealant (clear).
1000 Single Basin Unit & Basin
500 Single Basin Unit & Basin
BATHROOM FURNITURE RANGE
ELITE
INSTALLATION INSTRUCTIONS
EL3514F
Tower Storage Unit
Including 4 pre-fitted shelves
700 Single Basin Unit & Basin
EL000
3SRW
EL1000D
EL000
1SRW
EL5000D
EL000
2SRW
EL7000D
x6
x2
x4
x2
ELITE 50_I
LITE 70_I
ELITE 100_I
To ensure full working use of the drawers
we recommend the use of Bauhaus basin
furniture trap BTR0410W
Please read these instructions carefully before starting installation
and keep in a safe place for future reference. ENSURE the room is well
heated and ventilated.
Check the contents of the pack carefully before installation. Bauhaus will
not be held responsible for any de-fit / re-fit costs where fault
y product has
been fitted.
If any fault is found with materials or workmanship, it must be reported
immediately to the manufacturer. Remedial action will be taken, based on
information received, on condition that: 1. Full details are supplied to the
manufacturer; 2. The product has not been
modified
or tampered with;
3. The manufacturer is informed of any damage/shortages prior to
installation. 4. The product has not been installed, or attempts have been
made to install.
We do not accept responsibility for any problems that may occur through
incorrect installation.
Advice & Safety
This product should be only be installed by a suitably qualified
Plumber/
installer
. Should the installation be completed by a non-qualified person any
product guarantee maybe considered invalid. For a claim made under our
warranty written certification of your installers qualifications
can be required.
It is advised that all doors and drawers are removed prior to fi
tting to avoid
unnecessary damage occurring.
It is recommended that the furniture and accessories are installed
after tiling, ensuring that the product is installed flat to the tile face
and allows product to be easily removed if required in the future.
This document has been prepared for your guidance, you must exercise
due care at all times.
Please note that some units are heavy. Always take care when lifting, and
follow health and safety guidelines. It is recommended that 2 people carry
out the installation of larger basin/vanity units over 30Kgs gross weight.
Warning!
Please check for any hidden pipes or electrical cables before
drilling holes in the floor or walls.
When using power tools always follow the manufacturer’s user instructions.
This installation guide details fitting to a solid wall. If your
bathroom has
studded/plasterboard walls, please use appropriate plasterboard
fixings.
Please ensure the wall can take weight of units detailed above. Before
installing a wooden bathroom unit into a new property, extension or recently
plastered room we strongly advise the building/room is completely dry, well
ventilated and adequately heated.
Important pre-installation notes
To ensure full working use of the drawers we recommend the use of
Bauhaus basin furniture trap BTR0410W.
Care & Cleaning
Cast mineral marble products should be cleaned regularly with warm soapy
water, then rinsed with clean water and, if desired, dried and polished with
a soft cloth. Lime scale deposits can be removed using a 50:50 solution of
warm water and lime scale remover and soft clean cloth. We recommend
regular cleaning with Bauhaus Cream Polish SD150RW, specially
formulated to clean and help protect the surface of cast mineral marble
basins.
Do not use abrasive cleaners or bleach in this will permanently damage the
high gloss surface.
Use a well wrung chamois leather or micro fibre cloth to clean f
urniture
carcasses.
If any maintenance is required then it must be carried out by a
qualified
Plumber.
The manufacturer reserves the right to make technical modificat
ions without
prior notice.