background image

For any further information please contact  

Bauhaus on: 

0845 873 8840

Or visit our web-site at:

 

www.bauhaus-bathrooms.co.uk

The manufacturer reserves the right to make technical 

modifications without prior notice.

a:

 Attach the tap to basin and 

carefully bed in the waste 

using silicone 

only

.

b: 

Carefully apply silicone to 

the top edges of the unit.

c:

 Carefully position the basin 

down onto the unit, ensure it is 

centrally positioned and flush 

at the back.
Connect the tap and waste.
Leave the silicone to dry for  

24 hours.

a: Attach handle:

 Attach the handle to the 

drawer front. 

b: Re-fit drawer:

 Pull out both runners. 

 

1:

 Place the drawer onto the runners. 

 

2:

 Push in until the drawer ‘clicks’ into 

position.

Important information

All ceramic sanitary ware is subject to the limitations of the 

manufacturing process. Unlike machine finished products, natural 

clay based products shrink and move during high temperature 

firing and, because it is not possible to control this process 

absolutely, minor variations in the dimensional tolerance, form 

and surface of the finished products will occur.

Before installing a wooden bathroom into a new property, 

extension or recently plastered room we strongly advise the 

building/room is completely dry, well ventilated and adequately 

heated.

Step 6

Step 7

1

2

‘click’

a

c

b

Note: Basin waste and tap fittings when over tightened can 

create stress within the ceramic material which may in time 

cause the failure of the product. Waste fittings should be 

carefully bedded in silicone and the back nut hand tightened an 

additional quarter turn using a suitable spanner is sufficient to 

create the required watertight seal. Care should also be taken 

when fitting brassware to tap platforms in order to prevent 

similar stress related failures. 

a

b

Summary of Contents for ESSENCE 400

Page 1: ...ety guidelines It is recommended that 2 people carry out the installation of larger basin vanity units Warning Please check for any hidden pipes or electrical cables before drilling holes in the floor or walls When using power tools always follow the manufacturer s user instructions Always use the correct wall fixings for non solid walls not supplied Important pre installation notes The carcass on...

Page 2: ...gs supplied 2 Attached to the top of the basin unit using silicone 3 Both options 1 and 2 400 Basin Single Drawer Basin Unit 80mm 155 mm 155 mm 285mm 600 Basin Single Drawer Basin Unit Hanging Basin directly on wall Use the measurements above to position the basin on the wall a Mark the fixing hole positions onto the wall Drill Ø 12mm holes insert the wall plugs and screw in the fixing bolts b Pos...

Page 3: ...can be spaced apart the brackets must fit within that measurement b Mark the bracket fixing holes onto the wall Drill Ø 8mm holes insert the wall plugs and attach the brackets c Important The brackets must be the correct way up as shown Position the unit on the brackets Important If the basin unit and or basin are not fitted level this may result on the basin not draining correctly a c Top b b 175...

Page 4: ... manufacturing process Unlike machine finished products natural clay based products shrink and move during high temperature firing and because it is not possible to control this process absolutely minor variations in the dimensional tolerance form and surface of the finished products will occur Before installing a wooden bathroom into a new property extension or recently plastered room we strongly...

Reviews: