3
a:
Attach the tap to basin and
carefully bed in the waste
using silicone
only
.
b:
Carefully apply silicone to
the top edges of the unit.
c:
Carefully position the basin
down onto the unit, ensure it is
centrally positioned and flush
at the back.
Connect the tap and waste.
Apply a bead of silicone to the
join between the basin/unit and
wall, on all 4 sides.
Leave silicone, 24 hours to dry.
Re-fit drawer:
Pull both drawer runners
fully out.
1:
Set the drawer down onto the runners.
2:
Push the drawer fully in until it locks
(click).
Test to make sure the drawer operates
correctly.
Tower Storage Unit Installation
-
LN3516F 27Kg
Step 1
The storage unit is designed to offer
universal left/right hand door opening
without removal of hinges.
a:
Decide on the opening side of the
door. Rotate the whole unit to change
the opening side.
b:
We suggest positioning the tower
storage unit so it is level with any other
units that have been installed.
a
b
Note:
Basin waste and tap fittings when over tightened can create stress within
the basin material which may in time cause the failure of the product. Waste
fittings should be carefully bedded in silicone and the back nut hand tightened an
additional quarter turn using a suitable spanner is sufficient to create the required
watertight seal. Care should also be taken when fitting brassware to tap platforms
in order to prevent similar stress related failures.
Step 4
a:
Check the unit is level.
If levelling is required, use
a screwdriver to adjust the
hanging position, as follows:
b:
To lift or lower the unit,
adjust the screw shown.
c:
To move the unit closer or
further from the wall, adjust the
screw shown.
b
c
a
Step 5
Step 6
1
2
‘click’
a
c
b