a:

 Attach the tap to basin and 

carefully bed in the waste 
using silicone 

only

.

b: 

Carefully apply silicone to 

the top edges of the unit.

c:

 Carefully position the basin 

down onto the unit, ensure it is 

centrally positioned and flush 

at the back.
Connect the tap and waste. 

Apply a bead of silicone to the 
join between the basin/unit and 

wall, on all 4 sides.
Leave silicone, 24 hours to dry.

Re-fit drawer:

 Pull both drawer runners 

fully out. 

1:

 Set the drawer down onto the runners.

2:

 Push the drawer fully in until it locks 

(click).
Test to make sure the drawer operates 
correctly.

Tower Storage Unit Installation 

-

 

LN3516F 27Kg

Step 1

The storage unit is designed to offer 

universal left/right hand door opening 

without removal of hinges.

 

a:

 Decide on the opening side of the 

 

door. Rotate the whole unit to change  
the opening side.

b: 

We suggest positioning the tower 

storage unit so it is level with any other 
units that have been installed.

a

b

Note:

 Basin waste and tap fittings when over tightened can create stress within 

the basin material which may in time cause the failure of the product. Waste 
fittings should be carefully bedded in silicone and the back nut hand tightened an 

additional quarter turn using a suitable spanner is sufficient to create the required 
watertight seal. Care should also be taken when fitting brassware to tap platforms 
in order to prevent similar stress related failures.

Step 4

a:

 Check the unit is level.

If levelling is required, use 
a screwdriver to adjust the 
hanging position, as follows:

b:

 To lift or lower the unit, 

adjust the screw shown.

c:

 To move the unit closer or 

further from the wall, adjust the 
screw shown. 

b

c

a

Step 5

Step 6

1

2

‘click’

a

c

b

Reviews: