17
3.6.1 Zähleranschluss
GRID
N
R S
T
PE
- 18 -
3.6.1 Meter Connec�on
R
S
T
N
PE
Parallel_A Parallel_B Meter-485 port
RS485A
RS485B
Three-Phase Smart Meter
SET
ESC
1
7
4
10
25
24
3
9
6
10
CHINT meter
Three-Phase Smart Meter
SET
ESC
1
7
4
10
25
24
3
9
6
10
RS 485
CHNT DTSU666
(3,6,9,10)
(1,4,7,10)
R
S
T
Grid
R
R
S
S
T
T
N
N
Parallel_A Parallel_B Meter-485 port
RS485A
RS485B
Grid
Eastron meter
Eastron SDM630-Modbus V2
RS 485
RS 485 B RS 485 A
B A G
(5,6,7,8)
(1,2,3,4)
1 2 3 4
R
S
T
5 6 7 8
GND
Eastron
5 6 7 8
R
S
T
Eastron
5
6
7
8
Inverter
Inverter
GRID
N
R S
T
PE
PE
GND
GRID
N
R S
T
PE
- 18 -
3.6.1 Meter Connec�on
R
S
T
N
PE
Parallel_A Parallel_B Meter-485 port
RS485A
RS485B
Three-Phase Smart Meter
SET
ESC
1
7
4
10
25
24
3
9
6
10
CHINT meter
Three-Phase Smart Meter
SET
ESC
1
7
4
10
25
24
3
9
6
10
RS 485
CHNT DTSU666
(3,6,9,10)
(1,4,7,10)
R
S
T
Grid
R
R
S
S
T
T
N
N
Parallel_A Parallel_B Meter-485 port
RS485A
RS485B
Grid
Eastron meter
Eastron SDM630-Modbus V2
RS 485
RS 485 B RS 485 A
B A G
(5,6,7,8)
(1,2,3,4)
1 2 3 4
R
S
T
5 6 7 8
GND
Eastron
5 6 7 8
R
S
T
Eastron
5
6
7
8
Inverter
Inverter
GRID
N
R S
T
PE
PE
GND
Anmerkung:
Wenn sich der Wechselrichter im netzunabhängigen Zustand befindet, muss die N-Leitung mit
der Erde verbunden werden. Erde verbunden werden.
- 08 -
Please follow below steps to implement ba�ery connec�on:
1. Please choose a suitable ba�ery cable with correct connector which can well fit into the
ba�ery terminals. 2. Use a suitable screwdriver to unscrew the bolts and fit the ba�ery
connectors in, then fasten the bolt by the screwdriver, make sure the bolts are �ghtened
with torque of 24.5 N.M.
2. Nm in clockwise direc�on, make sure polarity at both the ba�ery and inverter is correctly
connected.
Connec�ng the ba�ery with a suitable cable is important for safe and efficient
opera�on of the system. To reduce the risk of injury, refer to Chart 3-2 for
recommended cables.
All wiring must be performed by a professional person.
3. In case of children touch or insects go into the inverter, Please make sure the inverter
connector is fasten to waterproof posi�on by twist it clockwise.
Before making the final DC connec�on or closing DC breaker/disconnect, be sure
posi�ve(+) must be connect to posi�ve(+) and nega�ve(-) must be connected to
nega�ve(-). Reverse polarity connec�on on ba�ery will damage the inverter.
Installa�on must be performed with care.
For 3.6KW/5KW model, ba�ery connector screw size: M6