background image

3

a:

 Attach the tap to basin and 

carefully bed in the waste 

using silicone 

only

.

b: 

Carefully apply silicone to 

the top edges of the unit.

c:

 Carefully position the basin 

down onto the unit, ensure it is 

centrally positioned and flush 

at the back.
Connect the tap and waste. 

Apply a bead of silicone to the 

join between the basin/unit and 

wall, on all 4 sides.
Leave silicone, 24 hours to dry.

Re-fit drawer:

 Pull both 

drawer runners fully out. 

1:

 Set the drawer down onto 

the runners.

2:

 Push the drawer fully in until 

it locks (click).
Test to make sure the drawer 

operates correctly.

Step 4

a:

 Check the unit is level.

If levelling is required, use 

a screwdriver to adjust the 

hanging position, as follows:

b:

 To lift or lower the unit, 

adjust the screw shown.

c:

 To move the unit closer or 

further from the wall, adjust the 

screw shown. 

c

a

Step 5

a

c

b

ZION wall hung unit DRAWER    3

May 17

b

Note

: Basin waste and taps fittings when over tightened can 

create stress within the basin material which may in time 

cause the failure of the product. Waste fittings should be 

carefully bedded in silicone and the back nut hang tightened

an additional quarter turn using a suitable spanner is sufficient to 

create the required waterlight seal. Care should also be taken 

when fitting brassware to tap platforms in order to prevent similar 

stress related failures.

Step 6

‘click’

2

1

Reviews: