Check-mark
Check these items:
Frequency
Verify the quick attach handles are locked.
Each operation.
Check the hydraulic fluid level to verify there is sufficient fluid
in the system.
Each operation.
Check hydraulic lines for breaks and punctures.
Each operation.
Verify hydraulic lines are plugged in securely.
Each operation.
Verify hydraulic lines are tied well away and cannot bind or
be pinched.
Each operation.
Check the cross bolts that secure the 6 pivot pins.
Each operation.
Check swing control function.
Each operation.
Verify the cutting tips on the cutting wheel are tight.
Every 4 hours.
Grease 2 pins on the deflector shield.
Every 6 hours.
Grease all 6 pivot pins.
Every 10 hours.
5.2 Pre-Operation Check List
15