12. Connect electrical controls to boom mower.
With engine off and electrical power on, select
each control function to verify pins on auxiliary
plug are in the desired locations. Light on valve
will illuminate when that valve is selected.
F - Tilt
G - Stick
H - Boom
F G H
13. Install all covers.
4.2 SWA Models
1. Connect boom mower to skidsteer. See Attach
Boom Mower in section 5.
2. Remove pins (A).
A
3. Verify valve lever is in the Cutting Head Off
position.
4. Operate skidsteer and position boom so
bushings align and install pins (A).
5. Shut off skidsteer engine.
A
11