Recommissioning
Operation manual
b maXX
BM4100 (NWR)
Document no.: 5.04052.09
Baumüller Nürnberg GmbH
130
12.6
12.6 Recommissioning
Execute commissioning as with a new device, see
.
CAUTION!
Recommissioning without forming of the capacitors.
From six months storage period on, the capacitors are destroyed during commission-
ing, if they are not formed beforehand
m
Reform the DC link capacitors:
n
by supplying the device ready-to-operate for at least one hour with
supply voltage
n
but do not transmit a pulse enable during this time.
m
Consider, that it is imperative, to connect the accordingly prescribed line commu-
tating reactor for this forming procedure.Devices, where no line commutating reac-
tor is necessary can directly be supplied with mains voltage.
Summary of Contents for b maXX 4100 Series
Page 143: ......