59
Operation manual
b maXX
BM4100 (NWR)
Document no.: 5.04052.09
7
I
NSTALLATION
This chapter describes the electrical installation of the device. The mechanical mounting
is described in
Initial commissioning is described in the
Parameter manual
b maXX 4100
in chapter
Commissioning.
Prior to installation, ensure that the technical prerequisites have been fulfilled:
1
Check the demands on the electrical power supply.
2
Check the requirements for the electrical cables and the provision of corresponding
cables.
3
Check the properties of the connections and the specified configuration of the respec-
tive cables.
7.1
Safety notes
NOTE!
Installation shall only be performed by employees of the manufacturer or by other
qualified personnel.
Qualified personnel are persons who – on account of their occupational training, ex-
perience, instruction and knowledge of relevant standards and stipulations, accident
prevention regulations and operating conditions – are authorized by the persons re-
sponsible for the safety of the facilities to perform the respective activities that are
necessary, while at the same time recognizing and preventing any potential risks.
The qualifications necessary for working with the device are, for example:
m
Occupational training or instruction, and the authorization to commission, ground
and mark electrical power circuits and devices in accordance with the standards of
the safety engineering.
m
Occupational training or instruction, in accordance with the standards of work safe-
ty, for the care and use of appropriate safety equipment.
Summary of Contents for b maXX 4100 Series
Page 143: ......