Transport, Removal of Packaging
Basic Supply Unit BUG 622, 623
17
Baumüller Nürnberg GmbH
5.94034.07a
3
T
RANSPORT
, R
EMOVAL
OF
P
ACKAGING
The units are packed at the factory in accordance with the order.
Avoid strong shaking during transportation and shocks, e.g. when setting the units down.
After unpacking the units and checking that the shipment is complete and undamaged, you can start
assembly.
The packing consists of fibreboard, corrugated cardboard and/or wood. It can be disposed according to
the local regulations.
Report any transport damage without delay.
DANGER
If you detect a transport damage on the unit, it must not be connected unless an appropriate voltage
test has been carried out.
Ignoring this information can result in death, severe personal injury or considerable damage to
material assets.
Summary of Contents for BUG 622
Page 1: ...E 5 94034 07a Manual Basic Supply Unit BUG 622 623 ...
Page 8: ...Safety Notes 8 Basic Supply Unit BUG 622 623 5 94034 07a Baumüller Nürnberg GmbH ...
Page 16: ...Technical Data 16 Basic Supply Unit BUG 622 623 5 94034 07a Baumüller Nürnberg GmbH ...
Page 20: ...Assembly 20 Basic Supply Unit BUG 622 623 5 94034 07a Baumüller Nürnberg GmbH 4 1 Dimensions ...
Page 50: ...Maintenance 50 Basic Supply Unit BUG 622 623 5 94034 07a Baumüller Nürnberg GmbH ...
Page 57: ......