Product information
Syscompact 2000 M pro
26 / 98
822-175-2
To move the system to the
Ready for operation
operating state, press the On/Off switch on
the system control panel.
The system’s green indicator light comes on.
The status LED of the operational earth monitoring and the surge protective device
illuminate green.
The
key illuminates.
After pressing the
key or the emergency off button, the system status likewise
changes to the
Ready for operation
operating state.
Ready to switch on
An operating state in which:
All test voltage supplies are switched off;
All access points to the test area are closed.
To switch the system to the
Ready to switch on
operating state, press the
key on the
system control panel
.
The system’s red indicator light flashes for approx. 6 seconds.
The
key illuminates.
In operation
An operating state in which:
All access points to the test area are closed;
One or more test voltage supply is switched on.
To switch the system to the
In operation
operating state, press the
key on the system
control panel within 6 seconds (red flashing indicator light).
The red indicator light comes on.
Summary of Contents for Sys compact 2000 M pro
Page 97: ......