Commissioning
Syscompact 2000 M pro
36 / 98
822-175-2
4. Remove the earthing and short-circuit connection from the phase to be tested: at the
connection point and at the far end.
5. Make sure that the phases not being tested are earthed and shorted.
Screened cable with 3 phases
Screened cable with 1 phase