*When converted using kit 0595211
4. GENERAL INSTALLATION REQUIREMENTS
4.1
The installation must be in accordance with these instructions.
For the user’s protection, in the United Kingdom it is the law that all gas appliances are
installed by competent persons in accordance with the current edition of the Gas Safety
(Installation and Use) Regulations. Failure to install the appliance correctly could lead
to prosecution. The Council for the Registration of Gas Installers (CORGI) requires its
members to work to recognised standards.
In the United Kingdom the installation must also be in accordance with:
All the relevant parts of local regulations.
All relevant codes of practice.
The relevant parts of the current editions of the following British Standards:-
BS 1251
BS 4543 Part 2
BS 5440 Part 1
BS 5440 Part 2
BS 5871 Part 3
BS 6461 Part 1
BS 6891
BS 8303
Page 6
INSTALLER GUIDE
Gas
Natural (G20)
Propane (G31) *
Inlet Pressure
20mbar
37mbar
Input - Max. (Gross)
6.85kW (23,400 Btu/h)
6.7kW (22,860 Btu/h)
Input - Min. (Gross)
2.3kW (7,850 Btu/h)
4.0kW (13,650 Btu/h)
Burner Test Pressure (Cold)
20.0 ± 1.0mbar (8.0 ± 0.4in
w.g.)
37.0 ± 1.0 mbar (14.85 ±
0.4in w.g.)
Gas Connection
8mm pipe
8mm pipe
Burner Injector
Stereomatic Cat 82 - 074
Stereomatic Size 132
Pilot & Atmosphere Sensing
Device
Copreci Ref. O.D.S
21500/166
Copreci Ref. O.D.S
21500/166 Fitted with RBM
180 -02 injector
Ignition
Integral Piezo Spark
Integral Piezo Spark
Aeration
See section 11.1
Non-adjustable