appliance is fitted into the fireplace
it will be necessary to extend the supply line so
that it will project through the hole in the back of the hotbox and run to the ‘T’
connector at the front. The pipe run from the supply line up to the rear opening in the
hotbox must be kept away from the area which will be taken by the hotbox when it is
installed. Note that the centre of the appliance inlet ‘T’ connector is 25mm above the
fireplace floor. The inlet ‘T’ connector should be fitted to the supply pipe at this stage.
9. PREPARING APPLIANCE FOR INSTALLATION
1.
The fire is fitted with two transit support screws.
These are located on the sides of the hotbox and are
labelled. They prevent burner assembly movement during
transit. Remove the transit screws and discard.
2.
Remove the two screws to the side of the burner
assembly (See figure 9)
3.
Detach the burner assembly from the hotbox by
holding the ‘bowl’ and gently sliding forward. The
burner assembly is heavy and if not supported
sufficiently will drop when clear of its support brackets.
When sliding the burner assembly be be careful not to
lift it as this may scratch the top surface.
4.
Fit the two “U” section seals to the bottom edges of
the hotbox side flanges (See figure 10).
5.
It is important that the grommet supplied in the
loose parts pack is fitted to the hole in the
rear of the convection box.
6.
For concealed connection only: Pierce
the grommet to allow the pipe to pass through
it. The grommet should envelop the pipe. If the
hole is larger than the pipe, seal it with tape.
Do not pierce the grommet unless the supply
pipe is to pass through it
.
Page 15
INSTALLER GUIDE
Fireback 10. Fitting “U” Seals
Figure 9.Burner module
removal