11
© Baxi Heating UK 2012
7.0
Installation of hydraulic station
7.1
Parts list
Before commencing the installation check all listed components
are contained in the following cartons.
Hydraulic Station carton:
1.
Hydraulic pump station with insulation incorporating
wall mounting bracket.
2.
Solar differential temperature controller.
3.
Safety group, comprising-
Pressure relief valve, pressure gauge and fill &
drain valve.
4.
22mm compression fitting nut and olive(4 off).
5.
Sensor extension cable (13m) (not shown).
Ancillary component carton:
6.
Solar expansion vessel complete with mounting bracket
and strap assembly.
7.
Expansion vessel connecting hose.
8.
Expansion vessel self sealing connection.
1
2
3
4
Fig. 9 (Diagrams not to scale)
8
7
6