9.3 Sealing floor front - all installations.
Using the floor sealing tape supplied, seal the bottom of
the convection box to the fireplace and hearth floor
(See figure 21).
Make sure that the whole length of the front edge of
the convection box is fully sealed.
10. BURNER & SUPPLY PIPE INSTALLATION
10.1 Burner and supply pipe installation.
1.
Refit the burner unit to the convection box with two screws.
2.
Connect the supply line to the appliance.
3.
Turn on the gas supply and pressure check the installation pipework for gas
soundness. In the United Kingdom (GB) check in accordance with the current edition
of BS 6891. In the Republic of Ireland check in accordance with the current edition of
IS 813 “Domestic Gas Installations”.
10.2 Preliminary burner checks.
Some burner operations can be checked at this stage. Checking now will mean that
less disassembly will be required if any problems are found.
A full check should still
be made, however, after final installation.
10.2.1
Lighting the fire.
If closed
,
open the isolating inlet ‘T’ connector. Depress the control knob and slowly
rotate it anticlockwise to the pilot ignition position. A ‘click’ will be heard as the integral
piezo operates. A spark should be seen between the electrode and pilot tip. Turn the
control knob clockwise to the ‘Off’ position. Repeat this operation until a flame
appears at the pilot. There may be a delay before the pilot lights due to air being
purged from the system. When a flame appears at the pilot keep the control knob
depressed and hold the pilot ignition position for five seconds. When the control knob
is released the pilot flame should remain lit.
10.2.2
Operating the burner.
When the pilot burner is operating properly, gradually turn the control knob anti-
clockwise to ‘HIGH’ (Depress the knob slightly to get past the pilot ignition position).
The main burner should now light. Depress the control knob slightly to release from
the ‘HIGH’ position and turn back (clockwise) to ‘LOW’. While turning, the burner
Page 25
©
Baxi Heating U.K. Limited 2010.
Figure 21. Floor sealing