CONTENTS (Continued)
Section
Heading
Page
10. BURNER & SUPPLY PIPE INSTALLATION
25
10.1 Burner and supply pipe installation.
25
10.2 Preliminary burner checks.
25
10.2.1 Lighting the fire.
25
10.2.2 Operating the burner.
25
10.2.3 Checking the inlet pressure.
26
11. CERAMIC WALLS INSTALLATION
26
12. FITTING THE CERAMIC FUEL EFFECT
27
13. FITTING THE FASCIA
28
14. FULL OPERATING CHECKS
28
14.1 Spillage check.
28
14.2 Flame supervision and spillage monitoring system.
29
15. FINAL REVIEW
30
16. SERVICING & PARTS REPLACEMENT
31
16.1 Checking the aeration setting of the burner.
32
16.2 To remove the fascia.
32
16.3 To remove the complete burner unit.
32
16.4 To remove the pilot unit.
32
16.5 To remove the gas valve.
33
16.6 To remove the piezo generator.
33
16.7 To grease the gas valve.
33
16.8 To replace the burner.
34
16.9 To remove the main burner injector.
34
Page 6
©
Baxi Heating U.K. Limited 2010.
INSTALLER GUIDE