background image

6

Vert SHRU

3.2

location & Clearances

1. The Assure SHRU has been developed for dwellings with the
bathroom on the second or higher floor, so that when taking a shower
the wastewater flows under natural conditions through the heat
exchanger installed on the floor below the bathroom. 

2. Therefore, the unit must be mounted vertically securely onto a flat wall
with the   supplied.
It is recommended that the SHRU is installed in a location where all parts
of the unit are accessible and routine maintenance such as cleaning can
be carried out with reasonable ease. 

3. Prevent the SHRU from being heated above 25°C by an external
source. Also, the SHRU must not be located where ambient
temperatures may be above 25°C.

4. The preheated water supply inline of the SHRU must be insulated in
accordance with the requirements of the ‘Building Services Compliance
Guide’.

Note

: Do not insulate the SHRU itself.

It is required that the distance from the shower tray to the SHRU is kept
to within 3 metres to reduce any heat losses and ensure good efficiency
is maintained. Minimum clearances of 80mm around the main body
should be maintained and adequate clearances must be maintained at
the top and bottom to ensure all components are accessible and can be
cleaned or replaced, if necessary.

3.3

Installation Recommendations

1. When showering with the SHRU installed, the cold water inlet
temperature will increase slowly because it will be warmed from the heat
transferred from the waste water, via the SHRU heat exchanger. 

2. If a non-thermostatically controlled showerhead is fitted, continued
adjustment of the valve will be required to avoid hotter water
temperatures from the shower. Therefore, it is required that a
thermostatically controlled showerhead is always fitted.

3. Ensure full flow shut off valves are fitted at both connections of the
unit to allow for any replacement of parts.

4. The cold/preheated feed pipe work to the shower from the SHRU must
be plumbed up to the T connection at the thermostatic mixing valve of
the shower, and then from this T connection to the cold inlet of the
combination boiler or hot water store. This will ensure static water is not
held in the line for long periods without being flushed, providing other hot
water taps are being used.

5. After installation all domestic water pipe work should be flushed and
cleaned. This also applies if a system has been substantially altered.
However, this would be required even if a shower heat recovery unit had
not been fitted. (Refer Approved COP – L8 for guidance)

6. Pipework between the SHRU preheated water outlet and the water
heater and /or shower cold water inlet(s) (depending on installation
configuration) must be labelled to indicate that no other services can be
interconnected.

7. The hot water store or combination boiler must be set to provide and
distribute hot water at a temperature of at least 60°C.

Summary of Contents for Assure Vertical SHRU

Page 1: ...sure Vertical SHRU should only be installed by a competent plumber who has the expertise to be guided by this manual Please read the entire manual before commencing the installation process Assure Vertical SHRU Installation Maintenance Manual Waste Water Heat Recovery Unit ...

Page 2: ...2 Vert SHRU Contents Section Page 1 0 Introduction 3 2 0 Technical Data 4 3 0 Installation Preparation 5 4 0 Installation 8 5 0 Maintenance 10 6 0 Warranty 10 ...

Page 3: ... with in conjunction with a system design checklist and an installation checklist and certificate of installation supplied with this document and available at www ncm pcdb org uk sap 4 The system should be installed by a suitably qualified plumber with system design consideration being equally important to a correct installation For recognition of the Assure SHRU within SAP a system design checkli...

Page 4: ... 8 6 110 mm 5 Baxi Assure SHRU Installation SAP Label 1 Product Body 2 Tee Piece 45 3 Cap Cleaning Access Ø50 4 45 Elbow Ø50 2 off 5 Adaptor Ø50 to Ø43 2 off 6 Reducer Male 3 4 to Female 1 2 inc cap 2 off 7 90 Elbow Female Ø50 Female Ø50 8 Mounting Bracket 2 off 9 Installation Maintenance Manual 10 SAP Label In addition it is strongly recommended to obtain two suitable isolation valves to be insta...

Page 5: ...er supply to the shower mixer valve is pre heated System B configuration or the pre heated mains water from the unit is only connected to the combination boiler or hot water cylinder System C configuration the efficiency of the SHRU will decrease by at least 15 System A Fig 2 SHRU outlet connects to water heater inlet AND shower cold inlet System B Fig 3 SHRU outlet connects to shower cold inlet O...

Page 6: ...RU installed the cold water inlet temperature will increase slowly because it will be warmed from the heat transferred from the waste water via the SHRU heat exchanger 2 If a non thermostatically controlled showerhead is fitted continued adjustment of the valve will be required to avoid hotter water temperatures from the shower Therefore it is required that a thermostatically controlled showerhead...

Page 7: ...r C configuration been selected 8 Is the plumbing design configured in order to prevent connection of hot water take off points such as taps from the SHRU preheated water outlet 9 Is an installation location specified for the SHRU that does not normally exceed 25 C 10 Can the SHRU be installed within a tolerance of 20mm of vertical 11 If shut off valves are specified for SHRU inlet and or outlet a...

Page 8: ...g the two holes It is not necessary to plug a wooden structure Fig 7 3 Fit the fixing clamps to the wall and mount the SHRU body in them with the waste water discharge at the bottom Ensure the body is vertical in all planes Fig 8 tighten the clamps 4 Take the 45 fork and determine the correct orientation Fig 9 then using a suitable adhesive fix it in place 5 Fit the 45 waste water inlet connectors...

Page 9: ...50 to Ø43 adaptor connect the waste water outlet to the waste system of the property Fig 12 7 Connect the pre heated cold outlet Fig 13 mains cold water inlet Fig 14 pipework It is strongly recommended that this pipework incorporates suitable isolation valves as shown Fig 12 Fig 13 Fig 14 ...

Page 10: ...on for leaks etc 6 0 Warranty 1 The Assure Vertical SHRU warranty is valid for 2 years after installation date 2 During the warranty period if the product has a defect in design material or workmanship it must be returned to the place of purchase 3 The warranty will be invalidated if product failures are caused by the following Installed with cold inlet pressure above 10 bar Use of the system with...

Page 11: ...Vert SHRU 11 ...

Page 12: ...scriptions and illustrations provided in this document have been carefully prepared but we reserve the right to make changes and improvements in our products which may affect the accuracy of the information contained in this leaflet All goods are sold subject to our standard Conditions of Sale which are available on request ...

Reviews: