14
We guarantee ease and flexibility of installation for a gas-fired forced draft boiler thanks to the
fittings and fixtures supplied (described below).
The boiler is especially designed for connection to an exhaust flue / air ducting, with either coaxial,
vertical or horizontal terminal. By means of a splitting kit a two-pipe system may also be installed.
In case exhaust and intake flues not supplied by BAXI S.p.A. have been installed, these must be
certified for the type of use and must have a maximum pressure drop of 100 Pa.
Warnings for the following types of installation:
C
13
, C
33
The terminals for the split flue must be provided for within a square with 50 cm sides.
Detailed instructions are given together with each accessory.
C
53
The terminals for combustion air intake and for the expulsion of combustion products must
not be provided for on opposite walls of the building.
C
63
The maximum pressure drop of the ducts must not exceed 100 Pa. The ducts must be certified
for the specific use and for a temperature of over 100
°
C. The chimney flue must be certified
in accordance with the prEN 1856-1 Regulation.
C
43
, C
83
The chimney or flue used must be suitable for the use.
14. Installation of flue
and air ducts
010828_0200
C
33
C
33
C
13
C
13
C
43
C
53
C
83
Figure 9
• template
• gas cock (16)
• inlet water tap with filter (17)
• heating system delivery cock (19)
• heating system return cock (18)
• washers
• telescopic tubes
• screws and wall plugs
13. Fittings present in the
packaging
Figure 8a
020503_0200
LUNA HT 280 - HT 330
18
17
16
19
Figure 8b
0010270500
LUNA HT 1.120 - HT 1.240 - HT 1.280
18
17
16
19