Instructions pertaining to the user
To correctly light the burner proceed as follows:
1) provide power supply to the boiler;
2) open the gas cock;
3) follow the directions given below regarding the adjustments to be made at the boiler control panel.
3. Commissioning of the boiler
2. Instructions prior to
commissioning
Initial lighting of the boiler must be carried out by a licensed technician. Ensure the following operations
are carried out:
a) compliance of boiler parameters with (electricity, water, gas) supply systems settings.
b) compliance of installation with the laws and regulations in force.
c) appropriate connection to the power supply and grounding of the appliance.
The names of authorized Service Centres are listed on the accompanying sheet.
Failure to observe the above will render the guarantee null and void.
Prior to commissioning remove the protective plastic coating from the unit. Do not use any tools or
abrasive detergents as you may spoil the painted surfaces.
This boiler is designed to heat water at a lower than boiling temperature at atmospheric pressure. The
boiler must be connected to a central heating system and to a domestic hot water supply system in
compliance with its performances and output power.
Have the boiler installed by a Qualified Service Engineer and ensure the following operations are
accomplished:
a) accurate purging of the whole pipework in order to remove any deposits.
b) careful checking that the boiler is fit for operation with the type of gas available. For more details
see the notice on the packaging and the label on the appliance itself.
c) careful checking that the flue terminal draft is appropriate; that the terminal is not obstructed and
that no other appliance exhaust gases are expelled through the same flue duct, unless the flue is
especially designed to collect the exhaust gas coming from more than one appliance, in conformity
with the laws and regulations in force.
d) careful checking that, in case the flue has been connected to pre-existing flue ducts, thorough
cleaning has been carried out in that residual combustion products may come off during operation
of the boiler and obstruct the flue duct.
1. Instructions prior to
installation