12
6.0 System Details
© Baxi Heating UK Ltd 2012
6.1
Information
1. The Baxi Neta-tec Combi GA Condensing Combination Boiler
is a ‘Water Byelaws Scheme - Approved Product’.
To comply with the Water Byelaws your attention is drawn to
the following installation requirements and notes (IRN).
a) IRN 001 -
See text of entry for installation
requirements and notes.
b) IRN 302 -
Byelaw 14.
2. Reference to the WRc publications, ‘Water fittings and
materials directory’ and ‘Water supply byelaws guide’ give full
details of byelaws and the IRNs.
6.2
Treatment of Water Circulating Systems
1. All recirculatory water systems will be subject to corrosion
unless they are flushed and an appropriate water treatment is
applied. To prevent this, follow the guidelines given in BS
7593 “Treatment of Water in Domestic Hot Water Central
Heating Systems” and the treatment manufacturers
instructions.
2. Treatment must involve the use of a proprietary cleanser,
such as Sentinel X300 or X400, or Fernox F3 and an inhibitor
such as Sentinel X100 or Fernox MB-1.
3. Full instructions are supplied with the products, for further
information contact Sentinel (0800 389 4670) or Fernox
(0870 870 0362).
Failure to flush and add inhibitor to the system will
invalidate the appliance warranty.
4. It is important to check the inhibitor concentration after
installation, system modification and at every service in
accordance with the inhibitor manufacturer’s instructions.
(Test kits are available from inhibitor stockists.)
5. For information or advice regarding any of the above
contact Technical Enquiries 0844 871 1555.
6.3
Bypass
1. The boiler is fitted with an automatic integral bypass. Some
systems may require an additional external bypass.
6.4
System Control
1. Further external controls (e.g. room thermostat sensors)
MUST be fitted to optimise the economical operation of the
boiler in accordance with Part L of the Building Regulations
(2010). A range of optional controls are available. Full details
are contained in the relevant Sales Literature.