4.4 Transportation
Transportation with a crane
Risk to life due to boiler falling!
Crane work must only be carried out by trained specialists!
The belts or cables to be used for lifting must be checked for perfect condition be-
fore using!
Persons taking part in transportation must wear protective gloves and safety
shoes!
Caution!
Risk of damage to boiler by impacts during transporting!
The boiler must
be protected during transport against impacts!
Fig. 5: Transport using a crane
- Place the carrying belts or cables according to
Fig. 5
around the wood paneling of
the boiler
- Lift boiler and set at the installation location
Prior to installation
8
1
Summary of Contents for POWER HT-A 1.430
Page 1: ... 1 QVWDOODWLRQ PDQXDO DV FRQGHQVLQJ ERLOHUV 3RZHU 7 ...
Page 8: ......
Page 13: ...3 4 Wiring diagram Fig 3 Wiring diagram Technical Data 3 1 ...
Page 41: ...Connection diagram Prior to installation 1 4 ...
Page 43: ...Connection diagram Prior to installation 3 4 ...
Page 45: ...Connection diagram Prior to installation 5 4 ...
Page 47: ...Wiring plan right POWER HT A Prior to installation 47 ...
Page 48: ...Wiring plan left POWER HT A Prior to installation 48 ...
Page 49: ...4 17 Legend Prior to installation 9 4 ...
Page 161: ...Space for notes 1 6 1 ...
Page 162: ...Space for notes 2 6 1 ...
Page 163: ...Space for notes 3 6 1 ...
Page 164: ......