5.0 Installation
30
5.18
Making the Electrical Connections
1. Remove the cover from the control box by removing
the 2 screws (Fig. 80).
2. Slide the box forward for easier access.
3. The terminal strips may be removed by carefully
pulling them forward. Connect the supply cable and the
pump cable to the terminal strips (Fig. 82).
IMPORTANT -
When installing in conjunction with
a thermal store or heat store please refer to the
store manufacturers installation instructions when
wiring the boiler.
4. The pump must be connected to the boiler terminals.
5. A permanent live must be connected to the 'L'
terminal.
6. The switched live must be connected to the 'S/L'
terminal.
7. Clamp the cables in the grips provided. Ensure that
the lengths of the supply cables are such that the
current carrying wires become taut before the earth
wires if the cable should pull out of the cable clamp
(Fig. 81).
8. Tuck the cables under the box and clip to the wall
where necessary. Make sure sufficient slack is left to
allow the box to slide forward for future access.
9. A cable clip is provided in the base of the box.
Switched Live
Permanent Live
Neutral
Earth
Pump Earth
Pump Neutral
Pump Live
Fig. 80
Fig. 81
Fig. 82