4. Drill holes (diameter 6 mm) in the positions marked.
5. Insert the dowels in the drill holes.
6. Use 2 screws to mount the support box, routing the cable through the
hole provided for this purpose.
7. Use 2 screws to mount the control panel, routing the cable through the
hole provided for this purpose.
6.2.3
Installing the outdoor unit
Installation on the ground
Use the floor support kit available as an option: package EH112.
Install the appliance on a solid, stable structure able to bear its weight.
Install the appliance a minimum of 80 mm above the ground.
1 Concrete base frame
2 Condensates run-off
3 Run-off channel with a pebble bed
Fig.30
MW-4000126-2
4
7
6
Fig.31
Installation on the ground
MW-4000127-1
3
2
1
80
6 Installation
42
SPC Split
7740321 - v04 - 03122019