10.4 Maintenance form for the installer
Tab.22 Maintenance carried out by the installer
No.
Operation
Periodicity
1
Check the cleanliness of the outdoor unit fan
once a year
2
Descaling the domestic hot water tank
after the first year of
use
and then every two
years
3
Checking the magnesium anode
after the first year of
use
and then every two
years
Tab.23 Maintenance carried out by installer no. 1: Date __________
No.
Remarks
By
Signature
1
2
3
Tab.24 Maintenance carried out by installer no. 2: Date __________
No.
Remarks
By
Signature
1
2
3
Tab.25 Maintenance carried out by installer no. 3: Date __________
No.
Remarks
By
Signature
1
2
3
Tab.26 Maintenance carried out by installer no. 4: Date __________
No.
Remarks
By
Signature
1
2
3
Tab.27 Maintenance carried out by installer no. 5: Date __________
No.
Remarks
By
Signature
1
2
3
10 Maintenance
7740321 - v04 - 03122019
SPC Split
69