www.baytex.co.nz
simplicity - performance - style
7/15
Baytex Manufacturing Co Ltd
10m Hip End Clipframe Marquee
Mid Frame Portal Assembly
12 Jun 2014
70.110.520 10m CF HE Erecting Manual.vwx
Assemble Mid Portal
10m CF Rafter
70.510.006
Apex Connector Mid
70.707
10m CF Rafter
70.510.006
Ø65mm Leg - 2.4m 180º
70.783
Ø65 Shoulder Connector
70.840
Ø65mm Base Foot
70.741
Ø65mm Base Foot
70.741
Ø65mm Leg - 2.4m 180º
70.783
Ø65 Shoulder Connector
70.840
10m Apex Brace
70.510.016
Brace Wires
70.510.023
( if required )
3. Join Rafters to Apex
- Use Button Lock
note: Mid Apex
1. Join Shoulder Connector to Rafter
- Use Button Lock
2. Join Leg to Shoulder Connector
- Use Button Lock
note: side leg has 180º collar
4. Join Base Fitting to Leg
- Use Button Lock
note: orientate pins to outside
6. Attach 2 Roof Brace Cables to Apex Pin
if Portal is adjacent to a Braced Bay
-Note: Only required on 10m x 35m and above
refer table page 15
1
2
3
4
6
Press this button
Engage lead button
Press this button
Engage lead button
Press this button
Engage lead button
5. Join Apex Brace to Rafters
- Use Lynch Pin
5
6/13
9m Clipframe Marquee
6/13
9m CLIPFRAME HIP END
Mid Frame Assembly