6  WARRANTY / PRODUCT LIABILITY AND DISCLAIMER 

 

In addition to the aforementioned regulations and safety instructions, the installation company must 
observe the valid regulations and standard engineering practice. 

The installation company is responsible for dimensioning the novotegra installation system. 

The installation company is responsible for connecting the interfaces between the installation system and 
the building. This also includes the seal tightness of the building envelope. 

On flat roofs, the installation company is responsible for the on-site assessment of the roof seal with regard 
to the sealing membrane material, durability, ageing, compatibility with other materials, general state of the 
roof seal and the need for a separation membrane between the roof seal and the installation system. The 
installation company must take the required and necessary measures and/or precautions for protecting the 
roof seal for the installation of the PV system substructure, if necessary with the involvement of a specialist. 
BayWa r.e. Solar Energy Systems GmbH shall bear no liability for incorrect or insufficient measures and 
precautions for protecting the roof seal. 

The installation company is responsible for the on-site testing of the coefficient of friction used in the 
calculation for verification of the anti-slide protection for PV systems on flat roofs. Coefficients of friction 
calculated on site can be taken into account and must be provided to BayWa r.e. Solar Energy Systems 
GmbH for the calculation. BayWa r.e. Solar Energy Systems GmbH shall assume no guarantee for the 
correctness of the assumed values and shall bear no liability in the event of damages caused as a result of 
the use of incorrect values. 

The instructions of the module, cable and inverter manufacturers must be observed. In the event of 
instructions that contradict those in this installation manual, be sure to contact your BayWa r.e. Solar 
Energy Systems GmbH sales team prior to installation or else the relevant manufacturer for components 
not supplied by BayWa r.e. Solar Energy Systems GmbH. 

Local conditions are not always sufficiently well known by our sales representatives when preparing 
quotations for novotegra. This may result in deviations from the quoted parts quantities during installation. 
In this case, the additionally required components must be installed in accordance with the final 
dimensioning. 

BayWa r.e. Solar Energy Systems GmbH shall bear no liability for incorrectly or incompletely filled-in data 
survey sheets. Completely filled-in and error-free data survey sheets are essential for correct dimensioning. 

The information in the installation manual, the warranty conditions and the disclaimer information must 
be observed. 

 

 

Summary of Contents for closed II

Page 1: ...I Installation manual novotegra for flat roofs closed II East West II...

Page 2: ...uired for installation 4 4 2 Installation system components installation variants 5 4 3 Installation system components optional 6 5 INSTALLING THE SUBSTRUCTURE 7 5 1 Installing the base rails and supp...

Page 3: ...hat the safety information is not observed Warning symbol with signal word Hazard class as per ANSI Z 535 DANGER indicates an immediate hazard Failure to prevent this could result in death or severe i...

Page 4: ...e installation system in accordance with this installation manual is 0 to 5 degrees The given torque values must be observed and tested on a random basis on site Information on structural analysis The...

Page 5: ...may lead to different results Protection against system sliding is verified based on a coefficient of friction of 0 5 This value must be checked by the installation company prior to installation If th...

Page 6: ...ening Flat roof mid clamp Material Aluminium and V2A Tool Socket bit AF 8 mm Support and module fastening Flat roof end clamp Material Aluminium and V2A Tool Socket bit AF 8 mm Support and module fast...

Page 7: ...ce replace of base foot and module supports set in the base trough 150 30 Correct installation 4 2 Installation system components installation variants Image Tool Component Product group Module suppor...

Page 8: ...Plastic Optional item Top cover base trough 150 30 3 00m Material Aluminium Optional item Self locking cable tie Optional item Cable clip d 10 mm Optional item Grounding connector set AF 18 Material V...

Page 9: ...s tightly together push the connectors under the ridge on the base troughs and screw together with two screws on each side Maximum uninterrupted rail length approx 17 m 10 rows with approx 1 70 m gap...

Page 10: ...fter approx 17 m 10 modules next to each other After approx 34 m 20 modules the system must be properly separated The distance between the adjacent base troughs must be 50 mm 5 2 Module installation l...

Page 11: ...f required The connection rail can be used to install the string cable or to insert the required ballast IV 7 applies if installing without connection rail Further rails can be used to redistribute lo...

Page 12: ...Screw the expansion joints to the base troughs On the moving side the two screws must be screwed into the base trough so that they are centred in the slots Installation expansion joint not below a mo...

Page 13: ...es when installing them Install the string cable first IV 6 Fastening the module to the system edge expansion joint Place the drilling screw from the flat roof end clamp centred over the screw channel...

Page 14: ...IV 8 Ballast troughs Using ballast troughs allows small or large size ballst to be securely inserted if required The ballast troughs must be mounted on the side of the base troughs 10kg 35kg 10kg 35k...

Page 15: ...used in the calculation for verification of the anti slide protection for PV systems on flat roofs Coefficients of friction calculated on site can be taken into account and must be provided to BayWa...

Page 16: ...en D 90419 N rnberg Phone 49 7071 98987 300 Phone 49 89 386670 0 Phone 49 911 216646 0 Fax 49 7071 98987 139 Fax 49 89 386670 10 Fax 49 911 216646 10 tue solarenergysystems baywa re com mue solarenerg...

Reviews: