T R A D I T I O N A L S E R I E S S T R A I G H T M O D E L • G R E E N H O U S E I N S T R U C T I O N S
Glass & Cap Installation
(contd.)
length)
is pushed against the glass.
Use #8 x 3/4”
screws to fasten the cap to the glassbar. Hold the cap
against the glass and put in your screws. When the
screw hits the cap, make a 1/4” turn. In other words,
do
not tighten the screws too tightly.
Also, do not put a screw
in the top hole of the cap. When the first piece of glass
and cap is installed, go to the next bay. Finish off the
bottom row on one side only.
B.
Install the next row of glass, push the glass underneath
the gutter and set it on top of the bottom cap
.
Take the aluminum cap
(for length, see sketch)
.
The bottom hole of the second row of caps line up
with the top hole of the first row of caps. Again, do not
tighten the screw too tight. On a standard greenhouse,
this row will finish off the sidewall below the gutter.
4
3
3
– 24 –
4