background image

BD CSampler™ Installation Guide

5.  Align the front of the BD CSampler so that the holes on the module are lined up with the three threaded holes in the BD 

Accuri C6. Hold the module with one hand and screw in the front right mounting bolt to secure the BD CSampler to the BD 
Accuri C6, tightening with the tool provided (Figure 6). 

6.  Screw in the other two mounting bolts. 

WARNING

 Do not over tighten (Figure 7).

Figure 7

Figure 8

Figure 9

Figure 10

Figure 4

Figure 5

Figure 6

Tab

Holes

 

 

 

 

8.  Place the mat in position (Figure 10). 

WARNING

 Failure to keep the mat clear of 

plates, tubes or any other materials may result in damage to the BD CSampler.

9.  Install BD CSampler software.
10.  Turn on the BD Accuri C6.
11.  Run validation beads to ensure correct operation. Refer to BD Accuri C6 Software 

User Guide, Chapter 1.

3.  Open the lid of the BD Accuri C6 and locate the holes used to mount the BD CSampler (Figure 4).
4.  Hold the BD CSampler module with both hands and locate the tab in the slot on the back of the BD Accuri C6 (Figure 5).

7.  Connect the cable to the socket at the back of the BD Accuri C6 and switch on the BD Accuri C6. The BD CSampler will auto-

matically align itself and then remain in the home position (Figure 8 - 9).  

 www.AccuriCytometers.com                                 For Research Use Only. Not for use in diagnostic procedures. Class 1 Laser Product                                                  7820020  Rev-3

Reviews: