2-3
“Oil-Less” Scroll Laboratory Air
4107 9006 25.11
2.0 Installation
Qualifi ed electricians only should make power
connections to the control panel and any
interconnecting wiring. The control panel
has openings for electrical and alarm/data
connections.
Do not drill additional holes in
the control panel as this may void the system
warranty.
See Figure 2.1 for opening locations.
Ensure that the emergency generation system
electrical supply is consistent with the air system’s
requirements.
Three-phase power supplied from emergency
generator(s) must match that of the normal supply
to allow for correct direction of the motor rotation
at all times.
Electrical
Connection
Data
Connection
Alarm
Wires
Figure 2.1 Electrical/Alarm/Data Openings