5. Remove the source equipment wiring.
6. Push open the ears of the connectors (E) to remove the ribbon cables (B).
7. Using needle nose pliers, pull the flag terminals (F) off of the Breakout P.C.
Board (C) connectors (H).
NOTE:
There may be auxiliary wiring to the building automation system that needs to be
disconnected.
8. Pull the Breakout P.C. Board (C) off of the mounting pegs (D).
Replacement
CAUTION:
Maintain the polarity of the source equipment leads between the Master
Alarms, otherwise they may not operate as intended.
1. To replace the Breakout P.C. Board, reverse the order of the removal instruc-
tions.
2. To ensure proper operation, perform the “Function Checks” on page 2–5.
MedPlus TotalAlert® Alarm Network Operation and Maintenance Manual (205728)
Page 4-15
Master Alarm Breakout P.C. Board
Chapter 4: Removal, Replacement, and Adjustment Procedures
4
Summary of Contents for MedPlus TotalAlert
Page 370: ...Schematic Wiring Diagram Typical Local Alarm...
Page 371: ...Schematic Wiring Diagram Typical Master Alarm...
Page 372: ...Schematic Wiring Diagram Typical Master Alarm to Master Alarm...
Page 373: ...Schematic Wiring Diagram Typical Area Alarm...
Page 374: ...Schematic Wiring Diagram Typical Master Alarm to Three Area Alarm...
Page 375: ...Schematic Wiring Diagram Typical Master Alarm to Six Area Alarm Combination...