Figure 4-21. Remote-Mount Transducer and Demand Valve Assembly
4. Using a phillips head screwdriver, remove the four screws (E) that secure the
lid (F).
5. Note the position of the green wire (or shield wire) (G).
NOTE:
Polarity does not need to be observed for the red and black wires.
6. Using a small screwdriver, loosen the screws (H) that secure the three wires
(G and I) to the terminal block (J).
7. Remove the wires (G and I) from the terminal block (J).
MedPlus TotalAlert® Alarm Network Operation and Maintenance Manual (205728)
Page 4-51
Remote-Mount Transducer and Demand Flow Valve Assembly
Chapter 4: Removal, Replacement, and Adjustment Procedures
4
Summary of Contents for MedPlus TotalAlert
Page 370: ...Schematic Wiring Diagram Typical Local Alarm...
Page 371: ...Schematic Wiring Diagram Typical Master Alarm...
Page 372: ...Schematic Wiring Diagram Typical Master Alarm to Master Alarm...
Page 373: ...Schematic Wiring Diagram Typical Area Alarm...
Page 374: ...Schematic Wiring Diagram Typical Master Alarm to Three Area Alarm...
Page 375: ...Schematic Wiring Diagram Typical Master Alarm to Six Area Alarm Combination...