4.
INSTALLATION & OPERATION :
4.1 Installation
※
Inspecting the packing carton for damage that may have occurred while in transit.
Immediately notify the carrier and place of purchase if any damage is found. Retain the
package for future use.
※
Plugging the power cord to a 3-wire grounding receptacle. If an extension cord must
be used between the UPS and the nearest wall outlet, use a 3-wire grounding type
rated for at least 20 Amps.
※
Connecting your equipment to the UPS. To ensure that your computer equipment
will be protected during a utility failure, it is important to make sure that the
maximum power need of the equipment is not over the rated capacity of the UPS.
When blackout happens, LED of operation status will become red and alarm will
beep if the load is over the rated value. Meantime, if the overload is severe, the
UPS will shut down immediately for protecting UPS itself.
4.2 Operation
4.2.1 When the power cord is connected with normal city power, UPS will turn on automatically
and go through the procedure of self-test (about 3-4 sec.). If test results are O.K., the
green LED will be on.
4.2.2 Pushing the button for 3 seconds, the UPS will turn off the power. But, the red LED will
blink when the AC power cord is connected. To turn off the power completely,
please pull out the power cord. To push the control button will turn on the UPS
again.
4.2.3 During blackout, push the button for 3 seconds until the buzzer emit beeping, the UPS
will turn on and enter into back up mode. To turn off the UPS, please push the button
for 3 seconds.