Table of contents
3.1
Transport and Unpacking
18
3.1.1
Transport
18
3.1.2
Unpacking 18
4
Mounting 19
4.1
Installation in the control cabinet
19
4.1.1
Preparation of the control cabinet
19
4.1.2
Installation in a control cabinet wall
19
4.1.3
Earthing measures
19
4.1.4
Mounting of the Control Panel
20
4.1.5
Fitting the power supply cable
21
4.2
Connecting the Control Panel
22
4.2.1
Connecting cables
22
4.2.2
Protective Earthing
22
5
Operating Instructions
23
5.1
Switching the Control Panel on and off
23
5.1.1
Switching on
23
5.1.2
Shutting down and switching off
23
5.2
Operation 23
5.3
Servicing and maintenance
24
5.3.1
Cleaning
24
5.3.2
Maintenance 24
5.4
Emergency procedures
24
5.5
Shutting down
24
5.5.1
Disposal
24
6
Troubleshooting 25
7
Assembly dimensions
26
8
Technical Data
27
9
Appendix 28
9.1
Beckhoff Support and Service
28
9.1.1
Beckhoff branches and partner companies
28
9.1.2
Beckhoff company headquarters
28
9.2
Approvals for USA and Canada
29
9.3
FCC Approvals for the United States of America
29
9.4
FCC Approval for Canada
29
2
CP29xx
Summary of Contents for CP29xx-0000 Series
Page 2: ......