background image

Installation Instructions 

 

 

Installation Instructions 

 

Please also refer to chapter 

General instructions

 
 

Transport and Unpacking 

 

The specified storage conditions must be observed (see chapter 

Technical 

data

). 

 

Transport 

 

Despite the robust design of the unit, the components are sensitive to 
strong vibrations and impacts. During transport, your Industrial PC should 
therefore be protected from excessive mechanical stress. Therefore, 
please use the original packaging. 

 

Warning

 

 
Danger of damage to the unit! 
If the device is transported in cold weather or is exposed to extreme 
variations in temperature, make sure that moisture (condensation) does not 
form on or inside the device. 
 
Prior to operation, the unit must be allowed to slowly adjust to room 
temperature. Should condensation occur, a delay time of approximately 12 
hours must be allowed before the unit is switched on. 

 

Unpacking 

 
 

Proceed as follows to unpack the unit: 
 

1. Remove  packaging. 
2. Do not discard the original packaging. Keep it for future relocation. 
3. Check the delivery for completeness by comparing it with your order. 
4. Please keep the associated paperwork. It contains important 

information for handling the unit. 

5. Check the contents for visible shipping damage. 
6. If you notice any shipping damage or inconsistencies between the 

contents and your order, you should notify Beckhoff Service. 

 

 

8

 

 CP64xx 

Summary of Contents for CP64 Series

Page 1: ...Installation and Operating instructions for Built in Panel PC CP64xx Version 1 5 Date 2006 01 11...

Page 2: ......

Page 3: ...nstallation of the PC in the control cabinet 9 Earthing measures 9 Power supply 10 Fitting the Power Supply Cable 11 Connecting devices 13 Connecting cables 13 Check voltage rating and connect 13 Oper...

Page 4: ...he meaning of 443 BGB of the German Civil Code or a statement about the contractually expected fitness for a particular purpose in the meaning of 434 par 1 sentence 1 BGB In the event that it contains...

Page 5: ...d from the plant Pulling out the fieldbus connection plug uncouples the PC optional Items of equipment that have been switched off must be secured against being switched on again The Industrial PC s p...

Page 6: ...National regulations depending on the machine type Depending on the type of machine and plant in which the Industrial PC is being used there will be national regulations for the control of such machin...

Page 7: ...xx Opening the housing In order to open the PC housing first remove the four fastening screws see photo above using a cross head screwdriver The cover of the housing can then be removed to the rear Fo...

Page 8: ...n the upper part of the chassis has been folded away with the floppy drive 1 and CD ROM drive 2 there is a 4 slot computer core with an all in one plug in card motherboard 3 The connections are locate...

Page 9: ...connection Network The Ethernet adapter with RJ 45 connection 4 permits connection to a network PS 2 connections PS 2 The upper PS 2 connector 5 allows a PS 7 mouse to be used while a PC keyboard can...

Page 10: ...ns in temperature make sure that moisture condensation does not form on or inside the device Prior to operation the unit must be allowed to slowly adjust to room temperature Should condensation occur...

Page 11: ...e unit is in its mounting position the ventilation openings must not be obstructed Warning Extreme environmental conditions should be avoided as far as possible Protect the rear of your PC from dust h...

Page 12: ...5 A Length of stripped conductor 8 to 9 mm Supplied mains power unit The Industrial PCs is either fitted with a 100 240 V 50 60 Hz power supply unit standard or with a 24 VDC power supply unit with th...

Page 13: ...housing in order to assemble the PC power supply cable Materials for assembly of the connector Female plug connector Strain relief housing Female plug connector is correspondingly coded This female p...

Page 14: ...not used Pin assignment for the 24 VDC power supply unit Fitting the connector to the cable The plug is fitted to the cable as follows 1 Strip insulation from the cable ends Follow the technical data...

Page 15: ...nd to the devices that are to be connected Connect all data transfer cables if present to the appropriate plug in receptacles of the data telecommunication networks Reconnect all devices to the power...

Page 16: ...le to the hard disk the file will be destroyed Control software typically writes something to the hard disk every few seconds so that the probability of causing damage by switching off while the softw...

Page 17: ...as to be replaced according to the rules of the board manufactorer Danger Danger of Explosion if battery is incorrectly replaced Replace only with same or equivalent type recommended by the manufactur...

Page 18: ...Other cause Remove floppy disk or CD and press any key Check the setup settings Call Beckhoff Service Computer boots software starts but control does not operate correctly Cause of the fault is either...

Page 19: ...C Beckhoff Support Support offers you comprehensive technical assistance helping you no only with the application of individual Beckhoff products but also with other wide ranging services world wide s...

Page 20: ...atmospheric humidity and shock resistance are to be observed during transport and storage as in operation The shock resistance during transport can be improved by means of suitably packing the Industr...

Reviews: