Commissioning
EL3783
116
Version: 1.1
Fig. 145: Insertion of variable "Var 1" fitting to the oversampling (-factor)
Step 3: Linking an array variable with an oversampling PDO
By right click on “MAIN.aUI_Samples” (according to the last preceding paragraph Step 2a) or rather
“Var 1” (according to the last preceding paragraph Step 2b) within the Solution Explorer a window opens to
select the process data:
Fig. 146: Set up the link of the PLC array variable (left: for the last preceding paragraph Step 2a, right: for the
last preceding paragraph Step 2b)
Fig. 147: Select the EL3773 PDO "L1 Voltage Samples" to create a link to the PLC array variable
„aUI_Samples“