Operation
EL6910
88
Version: 1.8.0
Fig. 109: Multiple Download - Final Verification
To activate the safety projects, enter the password for the current user again and confirm with the
Next
button.
Fig. 110: Multiple Download - Activation
The Result dialog lists all safety projects with the status
Activated
and
Downloaded
. Click the
Finish
button to
finish the multiple download.