7 - PRE-DELIVERY CHECKLIST
To the dealer: Inspect the machine thoroughly after assembly to assure it is
functioning properly before delivering it to the customer. The following checklist
is a reminder of points to cover. Check off each item as it is found satisfactory or
after proper adjustment is made.
Engine oil level.
Gearbox oil level.
Guards and shield properly fastened.
Lubrication of grease fittings.
All hardware properly tightened.
All decals properly located and readable
(see fig. 2)
.
Blades properly installed, blade bolts and nuts tightened.
Overall condition (touch up scratches, clean and polish).
Test run, check for excessive vibration or overheating of bearings.
Operator’s Manual.
Review the Operator’s Manual with the customer. Explain the following:
Warranty.
Safe operation and service.
Correct machine installation and operation.
Daily and periodic lubrication, maintenance and inspections.
Troubleshooting.
Operational procedures and storage.
Parts and service.
Fill out the Pre-Delivery Checklist and Warranty Registration form.
Give customer the Operator’s Manual and encourage the customer to read the
manual carefully.
IMPORTANT: Warranty is not valid unless Pre-Delivery Checklist and Warranty
Registration form in Operator’s Manual is completed in detail and mailed to the
Company.
Model Number: __________
Serial Number: __________
Delivery Date: __________
Dealer’s Signature: __________
P
RE
-D
ELIVERY
C
HECKLIST
28
BEFCO
C
YCLONE
O
PERATOR
’
S
M
ANUAL
Summary of Contents for CYCLONE C30-CE5
Page 34: ...CYCLONE FRAME OPERATOR S MANUAL C30 CE5 PARTS MANUAL 34 BEFCO 04 2016 ...
Page 36: ...CYCLONE FRAME OPERATOR S MANUAL C30 CE5 PARTS MANUAL 36 BEFCO 04 2016 ...
Page 38: ...CYCLONE SPINDLE OPERATOR S MANUAL C30 CE5 PARTS MANUAL 38 BEFCO 01 2016 ...
Page 40: ...CYCLONE DECALS OPERATOR S MANUAL C30 CE5 PARTS MANUAL 40 BEFCO 01 2016 ...
Page 42: ...CYCLONE ACCESSORIES MULCHING KIT OPERATOR S MANUAL C30 CE5 PARTS MANUAL 42 BEFCO 01 2016 ...